[NIRI internal CAD]

NIRI System Verification Plan

The table below summarises the pool of observations which have been defined for NIRI System Verification. The list encompasses the various NIRI observing modes with a range of observing conditions and is intended to overfill the SV time available for any given mode to provide flexibility when scheduling and in their execution (e.g. with regards to target accessibility or conditions required). As described in the SV Principles, verification will be carried out on a mode by mode basis. Modes that are not being offered in the forthcoming semester (i.e. coronagraphy and polarimetry) will have their SV postponed and the corresponding entries in the table have been removed. Programs whose targets are unlikely to be accessible given the probable SV schedule have also been removed.

The table links to more information about each program (click on the program number) including specific aspects of the instrument and telescope to be verified, a summary of the possible scientific returns from successful observations, a target list and the members of the assessment team. Each program will link to the SV data and its assessment when available.

Program #

Modes

RA (hrs)

Obs conditions*

Low bg Imaging

High bg Imaging

Wide Field Imaging

Grism Spec

Corona

pol

IQ

clds

H20

sky bkg

1

0.05; K

         

9-16

50

50

Any

80

2

 

0.05:L',M'

       

17

20

50

50

50

3

   

1-0 S(1), 2-1 S(1), BrGamma, 3.28um

     

17

50

50

80

80

4

     

0.116;K

   

20

50

50

Any

80

5

     

0.05;H

   

9-13

80

50

Any

80

6

   

J,H,K

     

13, 15

50

70

Any

80

7

   

H,K

     

18

20

50

Any

80

8

0.05; FeII, PaBeta, BrGamma, H2, cont

         

10-14

20

50

Any

80

9

     

0.05 L, M

   

9-10

50

50

50

50

10

     

0.116 L, M

   

19

50

50

50

50


* See the detailed observing condition constraints for the precise meaning of the %-ile categories.

[Science Operations home] [System Verification home] [NIRI home]


Last update November 1, 1999; Joe Jensen and Phil Puxley