There is only limited automatic checking of the Science Program built
into the Observing Tool at this time. The following checklist may be useful
in identifying missing or incorrect elements in your Phase II Science Program.
Also see the instrument-specific checklists for common problem (accessible via
the OT instrument component
pages).
Observation elements
Each observation must be self-contained. Does each have all of the
required elements: target, guide star, instrument, observing conditions,
telescope offsets (if relevant), instrument sequence (if relevant) and at
least one "Observe"?
Targets
Does the target have the proper J2000 coordinates?
For
spectroscopic observtions of faint targets, has a reference star
whose coordinates relative to the science target are well known been
entered as a User target? Have the guidelines for such "blind acquisitions" been followed?
If the target has high proper motion then are the proper motions
correct?
Querying Simbad to determine the target position will now also return the proper motions.
Ephemerides to support non-sidereal observations should be added as a text note.
Are
additional finding charts needed (the default is to use DSS images)
and have they been sent to Gemini using the File Attachment facility on
the top program level of the science program viewer? Have the guidelines for making finding charts been followed?
Does the target have a name? The target name box should not be blank.
Wavefront sensor stars
Are the proper J2000 coordinates given?
Is the star suitably bright?
Is the star sufficiently far from the target to avoid unacceptable
vignetting of the science field?
Is the star within the WFS patrol field at each position in the
offset sequence?
If the star has high proper motion, are the proper motions correct?
Does
the star have a name? The target name box should not be
blank. Also, each target with a unique coordinate should have a
unique name.
If the AO guide star is the same as the target, the target and guide star names and coordinates should be identical.
Instrument Configuration
Is the instrument configured as required? See the web pages for
the individual instruments for options and suggestions.
Are other telescope components (e.g. Altair Adaptive Optics, GPOL) configured correctly?
Observing Strategy
Check the OT "tips and tricks" page for each instrument; these
provide instrument-specific guidance about observing strategy.
Use the sequence list to confirm that any offset, repeat and instrument
iterator steps are in the right order.
If you have combined observations into a
Scheduling Group, their order within the group does define the execution
sequence. Is the order correct?
Have reasonable assumptions been made about the number of acquisitions
that are needed?
Use the timeline to check that the total time is consistent with
the sensitivity needed (check with the latest integration time calculators).
Does your sequence contain an Observe command at the lowest level
of the tree hierarchy to actually take some data?!
Is the total time needed less than or equal to the time allocated
by the TAC?
Observing Conditions
Are the observing conditions understood and appropriate for the observation?
Loosening the observing conditions can significantly increase the
chances that an observation will be executed. The observing conditions should
reflect the worst conditions under which useful data can be obtained.
If significantly better observing conditions are needed than
were given in Phase I, then approval must be granted by the
appropriate Associate Director. See the change approval
process for details. This procedure must also be used to
request use of the airmass or hour angle constraints.
Priorities
There is no prioritisation implied by the order of the observations
within a Science Program (except within a group).
Have the high / medium / low flags been set appropriately for each observation?
Calibration
Is the baseline calibration plan understood and is it adequate for
the observation?
If additional calibration is needed beyond the baseline plan, then
are the calibration observations included?
Additional Information
Any additional information or instructions should be added in text
notes.
Deadlines
Has the Phase II file been submitted by the appropriate deadline?
Instrument-specific checks
The OT "tips & tricks" pages include separate lists of
instrument-specific checks.