You are here

2022A GN LLP Programs

Content owned by sleggett

The table below summarizes the Gemini North queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [21B] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2022A-LP-8 Walsh LP Addressing a Bias in the Relation Between Galaxies and Their Central Black Holes NIFS+AltairLGS 24.00
Execution Status: Dates Taken:
20220625 20220628 20220629
Completion Status:
1%
GN-2022A-LP-104 Hsieh LP Observational Characterization of Recurrently Active Main-Belt Comets and Near-Earth Main-Belt Comet Candidates GMOS 9.90
Execution Status: complete Dates Taken:
20220204 20220208 20220209 20220212 20220302 20220313 20220408 20220425 20220523 20220524 20220526 20220601 20220606 20220607 20220609 20220619 20220624 20220707 20220719
Completion Status:
100%
GN-2022A-LP-105 Howell LP Validation and Characterization of Exoplanets with Gemini HIgh-Resolution Imaging Visitor 25.00
Execution Status: complete Dates Taken:
20220210 20220211 20220212 20220215 20220216 20220509 20220510 20220511 20220513 20220514
Completion Status:
100%
GN-2022A-LP-106 Turner LP Exploring the Diversity of Exoplanet Atmospheres at High Spectral Resolution GMOS 35.10
Execution Status: complete Dates Taken:
20220309 20220311 20220312 20220313 20220315 20220322 20220616 20220618
Completion Status:
100%
GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2022A-LP-202 Bean LP A MAROON-X radial velocity search for planets around the nearest stars Visitor 50.00
Execution Status: Dates Taken:
20220324 20220325 20220326 20220328 20220401 20220402 20220408 20220409 20220411 20220412 20220413 20220414 20220415 20220419 20220420 20220422 20220425 20220426 20220427 20220528 20220529 20220530 20220531 20220602 20220708 20220709 20220710 20220711 20220712 20220713 20220714 20220715 20220716 20220718 20220719 20220720 20220721 20220722 20220723 20220724 20220725 20220726 20220727 20220728 20220729 20220731 20220801
Completion Status:
73%
GN-2022A-LP-203 Schambeau LP Investigating the Activity Drivers of Small Bodies in the Centaur-to-Jupiter-Family Transition GMOS 17.70
Execution Status: complete Dates Taken:
20220123 20220124 20220125 20220127 20220128 20220220 20220221 20220222 20220223 20220225 20220305 20220306 20220310 20220603 20220623 20220624 20220625 20220626 20220710
Completion Status:
100%
GN-2022A-LP-205 Howell LP Validation and Characterization of Exoplanets with Gemini HIgh-Resolution Imaging Visitor 15.00
Execution Status: complete Dates Taken:
20220509 20220510 20220511 20220513 20220514
Completion Status:
100%