The table below summarizes the Gemini North queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [21B] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2021A-DD-101 Jencson DD Confirming a Failed Supernova Candidate in M51 NIRI 2.00
Execution Status: complete Dates Taken:
20210401 20210402 20210406
Completion Status:
100%
GN-2021A-DD-102 Foley DD Finishing the Extraordinary "Super-Chandra" SN 2020esm GMOS 3.30
Execution Status: complete Dates Taken:
20210217
Completion Status:
100%
GN-2021A-DD-103 Chiboucas DD Probing the Origin of Ultra Compact Dwarfs in Coma GMOS 3.60
Execution Status: complete Dates Taken:
20210330 20210409 20210410 20210414 20210417
Completion Status:
100%
GN-2021A-DD-104 Gillessen DD Tracking a relativistically moving star during its pericenter passage around Sgr A* GNIRS+Altair / GNIRS+AltairLGS 12.00
Execution Status: complete Dates Taken:
20210429 20210430 20210503 20210514 20210516 20210519 20210531 20210612 20210613 20210614 20210621 20210705 20210802
Completion Status:
100%
GN-2021A-DD-105 Lin DD Follow up a magnetar-powered X-ray transient candidate from a binary neutron star merger GMOS / NIRI 3.50
Execution Status: complete Dates Taken:
20210512 20210513 20210514 20210515 20210516 20210531
Completion Status:
100%
GN-2021A-DD-106 AYDI DD TOWARDS A UNIVERSAL SCENARIO FOR SHOCK FORMATION IN NOVAE GMOS 0.50
Execution Status: complete / SToO Dates Taken:
20210622 20210623
Completion Status:
100%
GN Director's Discretionary Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2021A-DD-201 Hui DD 323P/SOHO in disintegration GMOS 2.40
Execution Status: complete Dates Taken:
20210212 20210213 20210216 20210220 20210303
Completion Status:
100%