1.2.1/1.2.5 M1 Cell Structure to Surface Heating ICD
Revision: 1.0
Author: Hansen
Start Date: 8/15/1995
Finish Date: 8/31/1995
Release Date: 4/3/1996
Responsible Group(s): OPT
Priority: 1
Associated Document(s):
Associated Drawing(s): 90-GP-0002-0006 - ICD, M1 Surface Heating System to M1 Cell Assembly \ 90-GP-0002-1009 - M1 Cell/M1 Control Node Box Interface \ 90-GP-0002-1021 - M1 Cell/System Coolant Lines Interface
Virginia Smith / web@gemini.edu
Created 10-04-2002
Gemini 8m Telescopes Project