1.1.1/3.12 Telescope Structure, Drives, and Brakes to Beam Feed to Pier Lab ICD
Revision: 1.0
Author: Pentland
Start Date: 6/5/1995
Finish Date: 7/27/1995
Release Date: 7/27/1995
Responsible Group(s): TEG
Priority: 3
Associated Document(s):
Associated Drawing(s): 90-GP-0001-0033 - Optical beam path to high resolution lab
Virginia Smith / web@gemini.edu
Created 10-04-2002
Gemini 8m Telescopes Project