1.1.1/1.4.4 Telescope Structure, Drives, and Brakes to M2 Control System ICD
Revision: 1.1
Author: Pentland
Start Date: 6/5/1995
Finish Date: 7/27/1995
Release Date: 10/4/1995
Responsible Group(s): TEG\CON
Priority: 0
Associated Document(s):
Associated Drawing(s): 90-GP-0001-0043 - Electronics crate positions


Virginia Smith / web@gemini.edu Created 10-04-2002
Gemini 8m Telescopes Project