Gemini Drawings Database Tool

Enclosure Drawings

Functional design requirements (Support Facility)


Drawing No: 86-GP-0710-0008
Drawing Title: Elevation along ridge (N-S looking E MK site)
Date: 6/29/1993
Revision: A
Approved for Release?: No
Release Date:



Ruth A. Kneale / web@gemini.edu Created 11-19-2002
Gemini 8m Telescopes Project