Gemini Drawings Database Tool
Enclosure Drawings
Mauna Kea support facility, base and site work - Architectural (rev 1)
86-M3-12A1-0001
: Notes, Symbols and Abbreviations
86-M3-12A1-0002
: Lower Level Floor Plan
86-M3-12A1-0003
: Upper Floor Plan
86-M3-12A1-0004
: Lower Access Platform Floor Plan
86-M3-12A1-0005
: Upper Access Platform Floor Plan
86-M3-12A1-0006
: Observing Level Floor Plan and Roof Plan
86-M3-12A1-0007
: 1/4" Scale Toilet Room Plan and Elevations
86-M3-12A1-0008
: Section and Schedules
86-M3-12A1-0010
: 1/4" Scale Section of Stair #1 and Elevator
86-M3-12A1-0012
: West Elevation and Developed Wall Elevation
86-M3-12A1-0013
: East Elevation
86-M3-12A1-0014
: North Elevation
86-M3-12A1-0015
: South Elevation
86-M3-12A1-0016
: Building Section
86-M3-12A1-0017
: Building Section
86-M3-12A1-0018
: Building Section
86-M3-12A1-0019
: Building Section
86-M3-12A1-0020
: Wall Sections
86-M3-12A1-0021
: Wall Sections
86-M3-12A1-0022
: Wall Sections
86-M3-12A1-0023
: Wall Details
86-M3-12A1-0024
: Wall Details
86-M3-12A1-0025
: Lower Level Reflected Ceiling Plan
86-M3-12A1-0026
: Upper Floor Reflected Ceiling Plan
86-M3-12A1-0027
: Partition Types and Details
86-M3-12A1-0028
: Room Finish and Door Schedules and Window Types
86-M3-12A1-0029
: Door and Window Details
86-M3-12A1-0030
: Miscellaneous Details
86-M3-12A1-0031
: Miscellaneous Details
86-M3-12A1-0032
: Miscellaneous Details
86-M3-12A1-0033
: Door Removal/New Siding Plan and Elevation
Ruth A. Kneale /
web@gemini.edu
Created 11-19-2002
Gemini 8m Telescopes Project