Functional and Performance Requirements
for the
Gemini Near Infrared Imager
Prepared by the
Institute for Astronomy
for the
United States Gemini Program
January, 1996
Document Acceptance and Concurrence
This document represents the current understanding of the capabilities and performance of the Gemini Near Infrared Imager to be designed, fabricated, tested, delivered, and commissioned by the Institute for Astronomy to the United States Gemini Program for use on the Gemini North 8-m telescope.
NOAO/USGP IfA
Table of Contents
100 Cassegrain Rotator Interfaces
110 Instrument Support Structure Interface
120 Helium Interface
150 Signal, Control, and Data Interfaces
170 Vacuum Interface
200 Control Systems Interfaces
210 Observatory Control System Interface
220 Telescope Control System Interface
290 General Control System Requirements
300 Array and Array Controller Interfaces
310 Science Detector Array Interface
320 Science Array Controller Interface
330 Data Handling System Interface
340 OIWFS Detector Array Interface
350 OIWFS Array Controller Interface
400 Environmental Requirements
520 Science Options
530 Image Quality and Optical Tolerances
540 OIWFS Feed
560 Baffling
570 Internal Instrument Background
580 Throughput
590 General Optical Requirements
610 Rigidity
620 Tolerances
650 Mass and Center of Gravity Requirements
660 Cooling System
670 Vacuum System
680 Mechanisms
700 Electrical and Electronic Requirements
710 Electronic Design Requirements
720 Cassegrain Cable Wrap Interfaces
740 Heat Dissipation
810 Software Design Requirements
910 Documentation
920 Training
930 Reliability
940 Maintainability and Serviceability
950 Lifetime
960 Safety
The purpose of the Functional and Performance Requirements (document) for the Gemini Near Infrared Imager ("NIRI FPRD") is to provide the Gemini scientific community with an understanding of what the NIRI will do and how quickly or how well it will do it, and engineers with the requirements to use to design the NIRI. This document answers the question "What?", but not the question "How?". The "How" is the design that is derived from, and traceable to, this document. That is, this document takes precedence over the design and fabrication documents.
The design must serve the requirements in this document completely. This means every feature of the NIRI should be traceable to a requirement in this document, and there should be no features of the NIRI that are not required by this document. The NIRI will be designed in stages, with a review after each stage is complete. Comments from the review committee will be folded into the design, so the requirements will change as the design changes. Therefore, this document will be updated as needed after each major design review to maintain the correspondence between requirements and design.
This document was written using the Design Requirements (document) for the Gemini Near Infrared Imager (NIRI DRD") as a guide. The NIRI DRD contains more than engineering requirements, including a brief description of the science goals driving the requirements, suggestions of good design practice, and other information useful to the engineering team designing the NIRI. Upon approval by all parties named on the signature page, this document supersedes the DRD and defines the NIRI capabilities and performance.
Controlling Documents. The following documents control the NIRI design:
NIRI Statement of Work
NIRI Quality Assurance Plan, to be written
Critical Design for the Cassegrain Assembly, RPT-I-G0044, 6 June 94
Reference Documents. The following documents will be useful in the NIRI design:
Gemini Software Design Description, SPE-C-G0037, 7 March 95
Gemini Instrumentation Control Document, ICD-G-0009, [Very Rough Draft], 20 July 94
Gemini System Error Budget Plan, SPE-S-G0041, Version 2.1, 1 February 94
Gemini Electronic Design Specification, SPE-ASA-G0008, 23 February 94
Gemini IR Array Controller Performance Requirements, 7 August 95
Fowler, et al., "Next Generation In InSb Arrays: ALADDIN 1024 x 1024 InSb Focal Plane Array Development Project Status Report", SPIE Volume 2198, pp. 623- 629, 13-14 March, 1994
Ott, Henry W., Noise Reduction Techniques in Electronic Systems, Second Edition, AT&T Bell Laboratories, 1988
Gemini ICD 07a, ICS Subsystem Interfaces, 22 February 95
AO Adaptive Optics
EPICS Experimental Physics and Industrial Control System
GNIRS Gemini Near Infrared Spectrograph
ICS Instrument Control System
IGPO International Gemini Project Office ("Gemini" or "the Project")
ISS Instrument Support Structure (the "cube")
NIRI Near Infrared Imager
OCS Observatory Control System
TCS Telescope Control System
USGP United States Gemini Program
100 Cassegrain Rotator Interfaces
110 Instrument Support Structure Interface
The NIRI shall interface mechanically to the Gemini Instrument Support Structure (ISS).
111 Ports
The NIRI shall be capable of being mounted on and used at any side-looking science instrument ISS port or the upward-looking port at the bottom of the ISS.
112 Instrument Mounting Plate Flatness
The NIRI mounting interface shall be repeatable within the optical tolerances of the alignment between NIRI and ISS when removed and replaced.
113 Instrument Mounting Plate Material
The NIRI mounting interface shall take into account the material of which the ISS is made and shall hold differential temperature effects to a level that permits the NIRI to meet all optical alignment requirements over the entire operating temperature range.
114 Fasteners
The fasteners that are engaged for load transfer from the Cassegrain handling rig shall be sized for a safe working load that includes a static and dynamic factor of safety to accommodate predicted loads on the Gemini telescope.
115 Optical Feed
The NIRI shall accept and use the Gemini telescope optical feed, which is approximately f/16 with a focal length of 128 meters. The beam comes to a focus 300 mm from the ISS mounting surface inside the NIRI.
Notes and Comments
The NIRI shall obtain helium for its cryocoolers and return low-pressure helium through the connectors provided in the Cassegrain Rotator Utility Box appropriate to each instrument port. The helium interface is described in ICD 1.9/3.7.
121 Number of Helium Connections
The NIRI shall have one high pressure connection for the entire instrument, and one low pressure return for the entire instrument. Each of these lines shall have appropriate tees on the instrument to service the cryocooler heads.
122 Length of Helium Line Runs
The high and low pressure lines to the Cassegrain Rotator Utility Box shall be of a length that permits the NIRI to meet Requirement 111. If good design practice dictates, coupling hoses of different lengths shall be supplied for mounting the NIRI on different ISS ports.
123 Helium Line Flexibility
The high and low pressure lines to the Cassegrain Rotator Utility Box shall be flexible enough to permit easy routing, connection, disconnection, and dressing for operation.
124 Type of Helium Connectors
The high pressure line shall connect to the Cassegrain Rotator Utility Box using a connector described in ICD 1.9/3.7.
Notes and Comments
The NIRI shall derive its electric power through the connectors provided on the Cassegrain Rotator Utility Box appropriate to each instrument port. The power interface is part of ICD 1.9/3.8, Science Instruments to System Cables.
131 Number of Electrical Connections
The NIRI shall have two electric power connections for the entire instrument. One connection will provide "clean" power for the computer and electronics, while the other will provide "dirty" power for the cryo coolers and fans. The "dirty" connection should provide optional 220 V./3 phase power for the cryo coolers. The NIRI shall have appropriate runs from a junction box to serve all instrument power needs. The ICD 1.5.2/1.9 describes cable wrap connector plates.
132 Length of Electrical Line Runs
The power line to the Cassegrain Rotator Utility Box shall be of a length that permits the NIRI to meet Requirement 111. If good design practice dictates, a means of dressing the power cable to a length appropriate for different ports shall be provided.
133 Electric Power Line Flexibility
The electric power line to the Cassegrain Rotator Utility Box shall be flexible enough to permit easy routing, connection, disconnection, and dressing for operation.
134 Type of Electrical Connectors
AC power is provided to the science instrument via two, dual 3-prong, 120 VAC outlets (NEMA 5-15) mounted on the cable wrap interface plate. One outlet pair is UPS conditioned power and the other is building mains power. The cable connector at the interface to the instrument is a circular MIL-style connector, MS3106R16-10S. The corresponding instrument connector must be an MS3100R16-10P. AC voltage at both observatories will be 120 VAC. Line frequency for Cerro Pachon is 50 Hz, while the Mauna Kea frequency is the US standard 60 Hz.
Notes and Comments
The NIRI shall derive cooling water supply (and return) for electronic enclosures and any other use through the connectors provided on the Cassegrain Rotator Utility Box appropriate to each instrument port.
141 Number of Plumbing Connections
The NIRI shall have one cooling water supply connection and one return line connection for the entire instrument. The NIRI shall have appropriate tees from these lines to serve all instrument cooling water needs.
142 Length of Cooling Water Runs
The cooling water lines to the Cassegrain Rotator Utility Box shall be of a length that permits the NIRI to meet Requirement 111. If good design practice dictates, a means of dressing the cooling water lines to a length appropriate for different ports, or lines of different lengths for different ports, shall be provided.
143 Cooling Water Line Flexibility
The supply and return lines to the Cassegrain Rotator Utility Box shall be flexible enough to permit easy routing, connection, disconnection, and dressing for operation.
144 Type of Plumbing Connectors
The cooling water lines shall connect to the Cassegrain Rotator Utility Box using a connector of type (TBD) and of gender (TBD), compatible with (TBD) vendor model number (TBD). The connector shall not permit more than a drop or two of coolant to escape the system when connecting or disconnecting the supply and return lines, and shall not leak during normal operation.
145 Resistance to Glycol
The cooling water lines and connectors shall not be damaged in any way when used with a cooling solution containing glycol.
Notes and Comments
150 Signal, Control, and Data Interfaces
The NIRI shall receive and provide all signal, control, and data paths through the connectors provided on the Cassegrain Rotator Utility Box appropriate to each instrument port.
151 Number of Signal, Control, and Data Connections
The NIRI shall have one connection for the entire instrument to the appropriate Cassegrain Rotator Utility Box for each of the following, if needed:
Circuit |
Connector Type Cable Wrap |
Instrument Connector |
Cable |
Control LAN in* |
BNC female |
BNC female |
RG 58 |
Control LAN out* |
BNC female |
BNC female |
RG 58 |
Time LAN in* |
BNC female |
BNC female |
RG 58 |
Time LAN out* |
BNC female |
BNC female |
RG 58 |
Event Bus in* |
BNC female |
BNC female |
RG 58 |
Event Bus in* |
BNC female |
BNC female |
RG 58 |
Event Bus out* |
BNC female |
BNC female |
RG 58 |
Synchro Bus* |
Fiber duplex SC |
Fiber duplex SC |
Fiber |
Data bus (star) |
Fiber duplex SC |
Fiber duplex SC |
Fiber |
Auxiliary Boot |
KPSE00F18-11S |
KPSE00F18-11P |
Multi-connector |
Video LAN |
TBD |
TBD |
(RG 58?) |
Interlock System |
TBD |
TBD |
TBD |
The NIRI shall have appropriate tees from these lines to serve all instrument needs. In/out signals marked with * must be bridged at the cable wrap connector plate when not connected to instruments. In the case of the Synchro Bus, the two connectors of the pair must be bridged.
152 Length of Signal, Control, and Data Runs
The signal, control, and data lines to the Cassegrain Rotator Utility Box shall be of a length that permits the NIRI to meet Requirement 111. If good design practice dictates, a means of dressing these lines to a length appropriate for different ports, or lines of different lengths for different ports, shall be provided.
153 Signal, Control, and Data Line Flexibility
The signal, control, and data lines to the Cassegrain Rotator Utility Box shall be flexible enough to permit easy routing, connection, disconnection, and dressing for operation.
Notes and Comments
The NIRI shall be provided with interfaces for adding liquid nitrogen for cool down when the instrument is on the ISS at the telescope.
Notes and Comments
The NIRI shall be provided with interfaces for the connection of vacuum lines when the instrument is attached to the ISS at the telescope.
Notes and Comments
200 Control Systems Interfaces
210 Observatory Control System Interface
(TBD)
Notes and Comments
220 Telescope Control System Interface
The Gemini-supplied OIWFS array controller shall be integrated with the Gemini Telescope Control System.
Notes and Comments
The NIRI shall provide a means for command and control of NIRI mechanisms and science array controller, and data capture from the science array without the need for having Gemini control systems (i.e., the Observatory Control System and the Telescope Control System) present or connected.
231 Physical Interface
The Engineering Interface shall use the same model and configuration of workstation as that used for the Instrument Control System that runs with other Gemini control systems.
232 User Interface
To the extent practicable, the user interface in the Engineering Interface should appear to a user to be very similar to the user interface in the Instrument Control System.
233 Command and Control
The Engineering Interface shall be capable of commanding and controlling all NIRI mechanisms and reading status from all NIRI sensors.
234 Data Capture
The Engineering Interface shall be capable of capturing data from the NIRI. This will not include wavefront data.
Notes and Comments
240 Interlock System Interface
(TBD)
Notes and Comments
(TBD)
Notes and Comments
(TBD)
Notes and Comments
(TBD)
Notes and Comments
280 reserved
290 General Control System Requirements
The NIRI shall meet all general control system requirements given below.
291 Operability
All filters, slides, mechanisms, and other controllable features of the NIRI shall be controllable by computer through the standard EPICS control paths from the Instrument Control System.
292 Configuration Time
The goal for configuration of the NIRI for an observation from any previous observation configuration is 3 minutes or less.
Notes and Comments
300 Array and Array Controller Interfaces
310 Science Detector Array Interface
The NIRI design shall make provision for the Gemini-furnished InSb science detector array.
311 Characteristics
The NIRI shall be designed to take the fullest possible advantage of an InSb detector with the following characteristics:
312 Mechanical Interface
(TBD)
313 Thermal Interface
(TBD)
314 Optical Interface
(TBD)
Notes and Comments
320 Science Array Controller Interface
The NIRI design shall make provision for the Gemini-furnished science array controller.
321 Mechanical Interface
(TBD)
322 Thermal Interface
(TBD)
323 Optical Interface
(TBD)
Notes and Comments
330 Data Handling System Interface
(TBD)
Notes and Comments
340 OIWFS Detector Array Interface
(TBD)
Notes and Comments
350 OIWFS Array Controller Interface
(TBD)
Notes and Comments
360 Telescope Control System Interface
(TBD)
400 Environmental Requirements
The NIRI shall be capable of being transported, stored, and operated in a wide range of altitude environments.
411 Transportation Altitudes
The NIRI shall be capable of being transported at any altitude between -70 m and 4,200 m by any transportation mode. The NIRI shall be capable of being transported by commercial jet with pressurized cargo compartments at altitudes up to 15 Km.
412 Storage Altitudes
The NIRI shall be capable of being stored in or out of its shipping container at any altitude between -70 m and 4,200 m.
413 Operation Altitudes
The NIRI shall be capable of being operated at any altitude between -70 m and 4,200 m.
Notes and Comments
421 Operational Environment
The NIRI operational environment shall be limited to -15 to +25 oC.
422 Survival Environment
The NIRI shall be capable of surviving a temperature range of -20 to +50 oC without damage.
423 Transport Environment
The NIRI shall be capable of withstanding without damage a temperature range of -20 to +50 oC during transport without damage.
The NIRI shall be capable of being transported and stored, in a wide range of altitude environments in the range 0 to 100% relative humidity, with condensing moisture.
Notes and Comments
If required by good design practice, the NIRI shall maintain a vacuum inside the dewar.
441 Creating the Vacuum
The NIRI shall provide a means to evacuate its dewar while the instrument is on its handling rig in the instrument support area, and while it is attached to the ISS.
442 Vacuum Quality and Duration
The NIRI shall be capable of being kept cold and operated without measurable degradation of scientific performance for 3 months. If needed the instrument shall be capable of being kept at room temperature without contamination of the detector or internal optics significantly affecting the scientific performance, for at least 3 months without pumping.
Notes and Comments
The NIRI shall be capable of operating in the mechanical environment of the Gemini telescopes and their base facilities, and shall be capable of withstanding shipment among Tucson, Mauna Kea, and Cerro Pachon.
451 Telescope Slew Rates
The NIRI shall be capable of withstanding slew rates of 2° per second in azimuth and 0.75° per second in elevation, or any combination of these, along with rotation of the Cassegrain rotator to maintain alignment with the parallactic angle as it changes at these slew rates. All optics and mechanisms shall meet their flexure and alignment specifications at these rates.
Notes and Comments
The NIRI shall meet all science requirements listed below.
511 Wavelength Range
The NIRI shall operate as a camera with grism spectroscopy and polarimetry option in the wavelength range 0.9 m m through 5.5 m m.
512 Detector Format
The NIRI shall be designed to use an InSb science detector array with a format of 1024 x 1024, with 27 m m square pixels. NIRI must be able to operate in all essential scientific modes with an only partly functional detector array. The design should allow an upgrade to a potential future larger InSb detector array.
513 Spectral Resolution
The GNIRS shall provide a low dispersion mode with R = 2000 that permits most atmospheric windows to be covered by the detector array. The GNIRS shall also provide an intermediate dispersion mode with R ³ 4000.
514 Pixel Scale
The NIRI shall provide three pixel scales:
515 Slit Length
The NIRI shall provide a selection of entrance slits with a length of approximately 120 arcsec for grism spectroscopy.
516 Polarizing Prism
The NIRI shall incorporate a polarizing prism and an appropriate focal plane mask for imaging polarimetry.
Notes and Comments
Spectroscopic capability in the 3 micron window is a desirable option.
530 Image Quality and Optical Tolerances
The image quality philosophy of the NIRI shall be that the Imager does not degrade the tip-tilt corrected image quality delivered by the telescope significantly when used in the 0.12"/pix and 0.05"/pix modes. In the 0.02"/pix mode, the image quality delivered by the AO system should not be degraded significantly. This is interpreted as a requirement that 85% of the geometric traytrace spots fall within one pixel for the design.
531 Alignment
The ability to accurately align the instrument with the telescope is critical to minimizing background flux. A means of establishing alignment shall be provided.
532 Focus
While all modes of operation shall be nominally confocal, minor focus adjustments depending on wavelength, pixel scale, or choice of filters are acceptable to control chromatic effects.
The NIRI shall provide an optical feed inside the cryostat compatible with the operation of the On-Instrument Wavefront Sensor module supplied by Gemini.
541 Beam Characteristics
(TBD) with a plate scale corresponding to 0.2" pixels. The optics inside the NIRI in the path to the OIWFS shall distort the beam fed to the GNIRS by the Gemini telescope no more than 60 nm rms.
542 Field Curvature
The beam feed optics shall be designed assuming the telescope is providing the NIRI its normal curved field uncorrected by adaptive optics.
543 Wavelength Sensitivity
The OIWFS beam shall contain as much of the energy from the telescope beam in the wavelength range of 1 m m to 2.5 m m as it is practical to provide.
Notes and Comments
The NIRI shall provide a means for simple target acquisition.
551 Target Complexity
The NIRI shall provide a means for locating the slit or the polarization mask on single stars, specific features, and complex fields.
The NIRI shall provide baffling of ambient thermal radiation and radiation from field sources other than the scientific target with the goal of minimizing the impact of such radiation of the detection of the scientific target.
561 Thermal Baffling
The NIRI shall contain sufficient thermal baffling to manage heat loading on the cryogenic systems within the limits of good design practice.
562 Optical Baffling
The NIRI shall contain proper optical baffling to reduce stray radiation. The goal is to minimize the impact of stray radiation on the scientific observations. It is recognized that there are observing situations where, despite best design efforts, stray light will be the dominant source of noise. An example might be the attempts to detect planets around bright stars.
570 Internal Instrument Background
The NIRI shall have an internal instrument background less than either the natural background from the observed science field or the dark current of the detector, whichever is greater.
In the design of NIRI, strong emphasis shall be put on achieving high throughput, so that the qualities of the Gemini telescope and the site can be exploited to the maximum extent possible.
581 Vignetting
The NIRI design shall properly consider vignetting, including diffraction effects.
582 Signal-to-Noise Ratio
The NIRI shall be designed to maximize signal-to-noise ratio.
590 General Optical Requirements
The NIRI shall meet the general optical requirements listed below.
591 Lyot Stop
The NIRI shall provide a cold Lyot stop at an image of the telescope pupil (the secondary mirror). The Lyot stop shall be capable of being changed and adjusted when the instrument is off the telescope and warmed up.
592 Coatings
The following characteristics of all optical coatings shall be specified in design documentation:
All coatings shall be unaffected by repeated thermal cycling over the operating, storage, and transportation temperature ranges.
593 Vacuum Environment
All optical components and coatings shall meet all performance requirements when operated in a vacuum of less than 10-5 Torr at operational temperatures.
594 Thermal Cycling
All optical components and coatings shall meet all performance requirements when thermally cycled at a maximum rate of temperature change of 0.25 K/minute.
Notes and Comments
The NIRI shall be designed to be rigid, and to meet all the requirements listed below.
611 Alignment of the Instrument to the Telescope Optics
The alignment of the NIRI cold stop with the secondary mirror shall be set and maintained to better than 1% of the apparent secondary mirror diameter.
611 Tracking with the OIWFS
Tracking performance when using the NIRI OIWFS shall be (TBD -- make it consistent with the error allocation given in the Gemini System Error Budget Plan and flexure with respect to feed slit.).
612 Tracking with the Peripheral Wavefront Sensor
Tracking performance when using the peripheral wavefront sensor is (TBD - flexure to be with respect to ISS).
620 Mechanical and Thermal Tolerances
Notes and Comments
Mechanical Tolerances in Alignment
Gravity Effects |
Thermal Effects |
|
Offner Optic |
(TBD) |
(TBD) |
Grating Turret |
(TBD) |
(TBD) |
X-Dispersion Turret |
(TBD) |
(TBD) |
Collimator |
(TBD) |
(TBD) |
Camera & Detector |
(TBD) |
(TBD) |
Filter Wheel, Pre-Slit |
(TBD) |
(TBD) |
Filter Wheel, Post-Slit |
(TBD) |
(TBD) |
OIWFS |
(TBD) |
(TBD) |
Slit Wheel |
(TBD) |
(TBD) |
Notes and Comments
644 Electronic Enclosures
All NIRI electronic enclosures mounted on the ISS shall be counted in the space requirements given above.
645 Access to Electronic Enclosures
The electronic enclosures shall be accessible without removing the NIRI from the ISS.
646 Access to Vacuum Ports
Vacuum ports on the NIRI shall be accessible without removing the instrument from the ISS.
646 Access to Liquid Nitrogen Ports
Liquid nitrogen ports on the NIRI shall be accessible without removing the instrument from the ISS.
647 Access to Helium Ports
Helium ports on the NIRI shall be accessible without removing the instrument from the ISS.
648 Mechanical Connections
All mechanical connections on the NIRI shall be accessible without removing the instrument from the ISS and while mounted with other instruments.
Notes and Comments
650 Mass and Center of Gravity Requirements
The NIRI shall meet all mass and center of gravity requirements listed below.
651 Total Mass
The NIRI shall have a mass of 2000 kg ± 100 kg.
652 Center of Gravity
The NIRI shall have a center of gravity on the port axis 1000 mm ± 100 mm from the mechanical interface on the ISS.
653 Balance Tolerance
The out-of-balance during operation due to moving elements, fixtures, (including LN2 boiloff) etc. within the NIRI shall be less than 400 N-m.
654 Ballast Weight
A ballast weight and its supporting structure shall be supplied as required to meet the above requirements.
655 Electronic Enclosures
All NIRI electronic enclosures mounted on the ISS shall count in the mass and center of gravity requirements given above.
The NIRI shall meet all cooling system requirements listed below.
661 Cooldown Time
The NIRI cooling system shall have the capability to cool the instrument from room temperature to operating conditions in 48 hours or less. Liquid cryogens are permitted to be used to meet this requirement, but may not be used to maintain the operating temperature for extended periods once it is achieved. Cryogenic closed cycle coolers shall be used to maintain the operating temperature once it has been achieved.
662 Warmup Time
The NIRI shall not require more than 24 hours to warm up the entire instrument from operating conditions to room temperature.
663 Thermal Stability
The NIRI detector assembly shall have an active temperature control system providing a variable accuracy to be set at the optimum temperature for the detector between 30 K and 40 K, and a stability of +/- 0.1 K.
664 Vibration
Adequate measures shall be taken to ensure that the use of cryogenic closed cycle coolers shall not introduce sufficient vibrations into the mechanical structure to prevent meeting all rigidity, alignment, tracking, and other performance requirements.
Notes and Comments
671 Staging and Holding Areas
(TBD)
672 Vacuum Pump Capacity and Selection
(TBD)
673 Operating Procedure and Set-Up
(TBD)
674 Test Set-Up
(TBD)
680 Operational Requirements for Mechanisms
NIRI mechanisms shall meet the requirements listed below.
681 Safety
No mechanism shall be back-driveable in the event of loss of electrical power.
682 Time to Function
The goal for all individual mechanisms is to take no more than 60 seconds to operate from any position to any other position.
The NIRI shall be delivered with an instrument handling rig that can hold the NIRI during installation on the ISS. The instrument handling rig shall also hold the NIRI during storage and will provide assistance during assembly and disassembly.
Notes and Comments
Metric dimensions shall be used in the NIRI.
6A1 Metric Dimensions on Drawings
Metric dimensions in millimeters shall be used in all as-built drawings, with dimensions called out to 0.01 mm.
6A2 Metric Fasteners
All screws, bolts, nuts, tapped holes, and fasteners shall be of standard metric sizes, and called out as such on the as-built drawings.
Notes and Comments
700 Electrical and Electronic Requirements
710 Electronic Design Requirements
The NIRI shall be designed in accordance with modern electronics engineering practice for astronomical instruments.
711 Grounding and Shielding
Separate ground returns shall be provided for low level signals, noisy components such as relays and motors, and hardware components such as mechanical enclosures, chassis, and racks.
712 Electrostatic Discharge
The NIRI design shall protect sensitive components from electrostatic discharge.
Notes and Comments
720 Cassegrain Cable Wrap Interfaces
Notes and Comments
Thermocouples (or gas thermometers) are required to monitor the cryo environment within the dewar and the detectors
731 Temperature Sensor Locations
(TBD)
732 Sensor Interfaces
The temperature sensor read-out interface shall be part of the Engineering Interface as described in section 234.
Notes and Comments
810 Software Design Requirements
The NIRI shall be a "conforming" instrument, in that it shall use EPICS and conform to Gemini software and control system standards and the requirements listed below.
811 Use of EPICS
The NIRI shall use a standard Gemini configuration of a workstation for the operator interface, connected to an EPICS based system used for controlling motors, coolers, and heaters and for receiving status information from sensors.
812 EPICS System
The EPICS system shall be a standard Gemini unit (VME crate, 68040 CPU, VxWorks operating system.
813 Use of the Core Instrument Controller Software Package
The NIRI software engineers shall use the Gemini-furnished Core Instrument Controller Software Package to develop the Instrument Control System (ICS).
Notes and Comments
The NIRI software shall be based on and use an EPICS system as required by 810.
821 Interfaces to the Gemini System
Interfaces to the Gemini system shall conform to the descriptions presented in the Core ICS documentation. In particular, all OCS commands to, and responses from, the NIRI shall be by CAD, CAR and SIR EPICS records as described in the Core ICS documentation. Interfaces to other Gemini subsystems shall conform to the relevant Interface Control Documents.
Notes and Comments
Gemini shall furnish a complete and final set of all Interface Control Documents not later than the NIRI PDR.
Gemini shall furnish to the NIRI software engineers a functional CICS (see 813) as soon as practical, and shall provide updates as they become available. The first release of the CICS should be by NIRI PDR with general information available before then.
Gemini shall furnish a complete interface description of the detector sub-system as soon as practical.
Gemini shall furnish a complete interface description of the OIWFS sub-system as soon as practical.
Gemini shall furnish a DHS (or a simulation thereof) when the detector subsystem is delivered.
The NIRI shall be delivered with adequate documentation to facilitate the operation, maintenance, and repair of the instrument.
911 Users Manual
The Users Manual shall be written to enable a new user of the NIRI to easily get acquainted with the operation of the instrument.
912 Service and Calibration Manual
913 Software Maintenance Manual
914 As-Built Drawings
The as-built drawings shall show all dimensions in millimeters, down to 0.01 mm. All fasteners specified in these drawings shall be standard metric sizes. All drawings shall otherwise be to IfA standards used in instruments of similar size, function, and complexity.
915 Drawing Standards
(TBD)
916 Drawing Numbering System
(TBD)
917 Drawing Filing System
(TBD)
Notes and Comments
The NIRI development team shall provide training documentation and a training course to Gemini operations personnel on the operation, maintenance, and repair of the NIRI.
The NIRI shall be designed and built to be reliable.
931 Downtime
The NIRI shall have a total downtime of 2%, with 1% as a goal. Where possible, component failure shall result in gradual performance degradation. Single point failures that may result in significant downtime shall be determined and, where necessary, critical spares shall be identified.
932 Continuous Duty
The NIRI shall be designed and built for continuous operation. Modules containing moving parts, e.g., cryocooler cold heads, shall be designed or selected to meet Requirement 931 assuming continuous operation.
940 Maintainability and Serviceability
The NIRI shall meet the requirements for maintainability in the Instrumentation Control Document, Section 2.2.
941 Standard Components
Wherever possible, the NIRI shall use unmodified commercially available standard components.
942 Modularity
To the extent possible, the NIRI shall be designed to be modular.
943 Access
Access to components and subassemblies shall be considered in the NIRI design, particularly for those elements that are accessed frequently. Tool and hand clearances shall be considered, as well as space required to remove modules, visual access to components (or a means to feel their correct position and alignment, e.g., for electronic connectors).
944 Alignment
Alignment of optical components shall be achieved to the extent possible by accurate machining of locating fixtures.
945 Relative Equipment Arrangements
Equipment shall be located with due consideration of the sequence of operations involved in maintenance procedures. To the extent possible, the most accessible locations shall be reserved for the items requiring most frequent access.
946 Subassemblies
Subassemblies of the equipment that require more frequent service (inspection, adjustment, repair, or replacement) shall be configured as plug-in modules or, if in racks, as drawers that can be withdrawn easily.
947 Handling
Modules greater than 20 kg in mass shall have suitable handles for use in removing, replacing, and carrying them. Handles shall be located such that the vector sum of resultant handling forces shall pass close to the center of gravity of the unit.
948 Revisability
Multilayer electronic boards shall not be used unless they are replaceable as a module. Backplane interconnections between custom boards is discouraged.
Notes and Comments
The NIRI shall be designed for an operational lifetime of 10 years without a major overhaul. Components likely to affect the lifetime requirement shall be identified.
Notes and Comments