Functional and Performance Requirements

for the

Gemini Near Infrared Imager

 

 

 

Prepared by the

Institute for Astronomy

for the

United States Gemini Program

 

January, 1996

 

Document Acceptance and Concurrence

This document represents the current understanding of the capabilities and performance of the Gemini Near Infrared Imager to be designed, fabricated, tested, delivered, and commissioned by the Institute for Astronomy to the United States Gemini Program for use on the Gemini North 8-m telescope.

NOAO/USGP IfA

 

 

Table of Contents

Purpose of This Document

Applicable Documents

Acronym List

100 Cassegrain Rotator Interfaces

110 Instrument Support Structure Interface

120 Helium Interface

130 Electric Power Interface

140 Cooling Water Interface

150 Signal, Control, and Data Interfaces

160 Liquid Nitrogen Interface

170 Vacuum Interface

200 Control Systems Interfaces

210 Observatory Control System Interface

220 Telescope Control System Interface

230 Engineering Interface

240 Interlock Bus Interface

250 Events Bus Interface

260 Synchro Bus Interface

270 Time LAN Interface

290 General Control System Requirements

300 Array and Array Controller Interfaces

310 Science Detector Array Interface

320 Science Array Controller Interface

330 Data Handling System Interface

340 OIWFS Detector Array Interface

350 OIWFS Array Controller Interface

400 Environmental Requirements

410 Altitude Environment

420 Temperature Environment

430 Humidity Environment

440 Vacuum Environment

450 Mechanical Environment

500 Optical Requirements

510 Science Requirements

520 Science Options

530 Image Quality and Optical Tolerances

540 OIWFS Feed

550 Target Acquisition

560 Baffling

570 Internal Instrument Background

580 Throughput

590 General Optical Requirements

600 Mechanical Requirements

610 Rigidity

620 Tolerances

630 Thermal Performance

640 Space Requirements

650 Mass and Center of Gravity Requirements

660 Cooling System

670 Vacuum System

680 Mechanisms

690 Instrument Handling

6A0 Metric Dimensioning

700 Electrical and Electronic Requirements

710 Electronic Design Requirements

720 Cassegrain Cable Wrap Interfaces

730 Temperature Monitoring

740 Heat Dissipation

800 Software Requirements

810 Software Design Requirements

820 EPICS Compatibility

830 Gemini Furnished Software

900 Other Requirements

910 Documentation

920 Training

930 Reliability

940 Maintainability and Serviceability

950 Lifetime

960 Safety

 

Purpose of This Document

The purpose of the Functional and Performance Requirements (document) for the Gemini Near Infrared Imager ("NIRI FPRD") is to provide the Gemini scientific community with an understanding of what the NIRI will do and how quickly or how well it will do it, and engineers with the requirements to use to design the NIRI. This document answers the question "What?", but not the question "How?". The "How" is the design that is derived from, and traceable to, this document. That is, this document takes precedence over the design and fabrication documents.

The design must serve the requirements in this document completely. This means every feature of the NIRI should be traceable to a requirement in this document, and there should be no features of the NIRI that are not required by this document. The NIRI will be designed in stages, with a review after each stage is complete. Comments from the review committee will be folded into the design, so the requirements will change as the design changes. Therefore, this document will be updated as needed after each major design review to maintain the correspondence between requirements and design.

This document was written using the Design Requirements (document) for the Gemini Near Infrared Imager (NIRI DRD") as a guide. The NIRI DRD contains more than engineering requirements, including a brief description of the science goals driving the requirements, suggestions of good design practice, and other information useful to the engineering team designing the NIRI. Upon approval by all parties named on the signature page, this document supersedes the DRD and defines the NIRI capabilities and performance.

 

 

Applicable Documents

Controlling Documents. The following documents control the NIRI design:

  1. NIRI Statement of Work

  2. NIRI Quality Assurance Plan, to be written

  3. Critical Design for the Cassegrain Assembly, RPT-I-G0044, 6 June 94

 

Reference Documents. The following documents will be useful in the NIRI design:

  1. Gemini Software Design Description, SPE-C-G0037, 7 March 95

  2. Gemini Instrumentation Control Document, ICD-G-0009, [Very Rough Draft], 20 July 94

  3. Gemini System Error Budget Plan, SPE-S-G0041, Version 2.1, 1 February 94

  4. Gemini Electronic Design Specification, SPE-ASA-G0008, 23 February 94

  5. Gemini IR Array Controller Performance Requirements, 7 August 95

  6. Fowler, et al., "Next Generation In InSb Arrays: ALADDIN 1024 x 1024 InSb Focal Plane Array Development Project Status Report", SPIE Volume 2198, pp. 623- 629, 13-14 March, 1994

  7. Ott, Henry W., Noise Reduction Techniques in Electronic Systems, Second Edition, AT&T Bell Laboratories, 1988

  8. Gemini ICD 07a, ICS Subsystem Interfaces, 22 February 95

 

 

Acronym List

AO Adaptive Optics

EPICS Experimental Physics and Industrial Control System

GNIRS Gemini Near Infrared Spectrograph

ICS Instrument Control System

IGPO International Gemini Project Office ("Gemini" or "the Project")

ISS Instrument Support Structure (the "cube")

NIRI Near Infrared Imager

OCS Observatory Control System

TCS Telescope Control System

USGP United States Gemini Program

 

100 Cassegrain Rotator Interfaces

 

110 Instrument Support Structure Interface

The NIRI shall interface mechanically to the Gemini Instrument Support Structure (ISS).

 

111 Ports

The NIRI shall be capable of being mounted on and used at any side-looking science instrument ISS port or the upward-looking port at the bottom of the ISS.

 

112 Instrument Mounting Plate Flatness

The NIRI mounting interface shall be repeatable within the optical tolerances of the alignment between NIRI and ISS when removed and replaced.

 

113 Instrument Mounting Plate Material

The NIRI mounting interface shall take into account the material of which the ISS is made and shall hold differential temperature effects to a level that permits the NIRI to meet all optical alignment requirements over the entire operating temperature range.

 

114 Fasteners

The fasteners that are engaged for load transfer from the Cassegrain handling rig shall be sized for a safe working load that includes a static and dynamic factor of safety to accommodate predicted loads on the Gemini telescope.

 

115 Optical Feed

The NIRI shall accept and use the Gemini telescope optical feed, which is approximately f/16 with a focal length of 128 meters. The beam comes to a focus 300 mm from the ISS mounting surface inside the NIRI.

 

Notes and Comments

  1. The ISS to Science Instrument ICD is 1.5.3/1.9. The 1.5.3 ISS Introductory ICD is also relevant.
  2. Fastener design must accommodate the changing direction of the gravity vector due to rotation of the ISS and positioning of the telescope.
  3. Telescope focal length is given in Gemini Telescopes f/16 Design Summary, RPT-0-G0047, 6 July 1994.

 

120 Helium Interface

The NIRI shall obtain helium for its cryocoolers and return low-pressure helium through the connectors provided in the Cassegrain Rotator Utility Box appropriate to each instrument port. The helium interface is described in ICD 1.9/3.7.

 

121 Number of Helium Connections

The NIRI shall have one high pressure connection for the entire instrument, and one low pressure return for the entire instrument. Each of these lines shall have appropriate tees on the instrument to service the cryocooler heads.

 

122 Length of Helium Line Runs

The high and low pressure lines to the Cassegrain Rotator Utility Box shall be of a length that permits the NIRI to meet Requirement 111. If good design practice dictates, coupling hoses of different lengths shall be supplied for mounting the NIRI on different ISS ports.

 

123 Helium Line Flexibility

The high and low pressure lines to the Cassegrain Rotator Utility Box shall be flexible enough to permit easy routing, connection, disconnection, and dressing for operation.

 

124 Type of Helium Connectors

The high pressure line shall connect to the Cassegrain Rotator Utility Box using a connector described in ICD 1.9/3.7.

 

Notes and Comments

  1. It is expected that Gemini will provide a helium supply of (TBD) liters/minute at a pressure of (TBD) units. The low pressure return line is expected to carry (TBD) liters/minute at a pressure of (TBD) units. All helium delivered to the NIRI is expected to be 99.999% pure. It is expected that details of the helium supply will be added to ICD 1.9/3.7.
  2. Details of the helium interface are expected to be obtained from the Quantum Study, due 29 February 1996.

 

130 Electric Power Interface

The NIRI shall derive its electric power through the connectors provided on the Cassegrain Rotator Utility Box appropriate to each instrument port. The power interface is part of ICD 1.9/3.8, Science Instruments to System Cables.

 

131 Number of Electrical Connections

The NIRI shall have two electric power connections for the entire instrument. One connection will provide "clean" power for the computer and electronics, while the other will provide "dirty" power for the cryo coolers and fans. The "dirty" connection should provide optional 220 V./3 phase power for the cryo coolers. The NIRI shall have appropriate runs from a junction box to serve all instrument power needs. The ICD 1.5.2/1.9 describes cable wrap connector plates.

 

132 Length of Electrical Line Runs

The power line to the Cassegrain Rotator Utility Box shall be of a length that permits the NIRI to meet Requirement 111. If good design practice dictates, a means of dressing the power cable to a length appropriate for different ports shall be provided.

 

133 Electric Power Line Flexibility

The electric power line to the Cassegrain Rotator Utility Box shall be flexible enough to permit easy routing, connection, disconnection, and dressing for operation.

 

134 Type of Electrical Connectors

AC power is provided to the science instrument via two, dual 3-prong, 120 VAC outlets (NEMA 5-15) mounted on the cable wrap interface plate. One outlet pair is UPS conditioned power and the other is building mains power. The cable connector at the interface to the instrument is a circular MIL-style connector, MS3106R16-10S. The corresponding instrument connector must be an MS3100R16-10P. AC voltage at both observatories will be 120 VAC. Line frequency for Cerro Pachon is 50 Hz, while the Mauna Kea frequency is the US standard 60 Hz.

 

Notes and Comments

  1. Gemini will provide an electric power supply as given in ICD 1.9/3.8.
  2. The NIRImay require 220 to 260 volts AC, 60 Hz, 3 phase power for cryo cooler operation. This type of power is not currently provided by the ISS.

 

140 Cooling Water Interface

The NIRI shall derive cooling water supply (and return) for electronic enclosures and any other use through the connectors provided on the Cassegrain Rotator Utility Box appropriate to each instrument port.

 

141 Number of Plumbing Connections

The NIRI shall have one cooling water supply connection and one return line connection for the entire instrument. The NIRI shall have appropriate tees from these lines to serve all instrument cooling water needs.

 

142 Length of Cooling Water Runs

The cooling water lines to the Cassegrain Rotator Utility Box shall be of a length that permits the NIRI to meet Requirement 111. If good design practice dictates, a means of dressing the cooling water lines to a length appropriate for different ports, or lines of different lengths for different ports, shall be provided.

 

143 Cooling Water Line Flexibility

The supply and return lines to the Cassegrain Rotator Utility Box shall be flexible enough to permit easy routing, connection, disconnection, and dressing for operation.

 

144 Type of Plumbing Connectors

The cooling water lines shall connect to the Cassegrain Rotator Utility Box using a connector of type (TBD) and of gender (TBD), compatible with (TBD) vendor model number (TBD). The connector shall not permit more than a drop or two of coolant to escape the system when connecting or disconnecting the supply and return lines, and shall not leak during normal operation.

 

145 Resistance to Glycol

The cooling water lines and connectors shall not be damaged in any way when used with a cooling solution containing glycol.

 

Notes and Comments

  1. It is expected that Gemini will provide a cooling water supply of (TBD) liters/minute at a pressure of (TBD) units and a temperature of (TBD)C. The low pressure return line is expected to carry (TBD) liters/minute at a pressure of (TBD) units and a temperature of (TBD)C.
  2. Plumbing connection standards may already exist within the Gemini project.
  3. Coolant mixture is expected to be 50/50 water/glycol.
  4. The cooling water interface is covered in ICD 1.9/3.6.

 

150 Signal, Control, and Data Interfaces

The NIRI shall receive and provide all signal, control, and data paths through the connectors provided on the Cassegrain Rotator Utility Box appropriate to each instrument port.

 

151 Number of Signal, Control, and Data Connections

The NIRI shall have one connection for the entire instrument to the appropriate Cassegrain Rotator Utility Box for each of the following, if needed:

 

Circuit

Connector Type Cable Wrap

Instrument Connector

Cable

Control LAN in*

BNC female

BNC female

RG 58

Control LAN out*

BNC female

BNC female

RG 58

Time LAN in*

BNC female

BNC female

RG 58

Time LAN out*

BNC female

BNC female

RG 58

Event Bus in*

BNC female

BNC female

RG 58

Event Bus in*

BNC female

BNC female

RG 58

Event Bus out*

BNC female

BNC female

RG 58

Synchro Bus*

Fiber duplex SC

Fiber duplex SC

Fiber

Data bus (star)

Fiber duplex SC

Fiber duplex SC

Fiber

Auxiliary Boot

KPSE00F18-11S

KPSE00F18-11P

Multi-connector

Video LAN

TBD

TBD

(RG 58?)

Interlock System

TBD

TBD

TBD

 

The NIRI shall have appropriate tees from these lines to serve all instrument needs. In/out signals marked with * must be bridged at the cable wrap connector plate when not connected to instruments. In the case of the Synchro Bus, the two connectors of the pair must be bridged.

 

152 Length of Signal, Control, and Data Runs

The signal, control, and data lines to the Cassegrain Rotator Utility Box shall be of a length that permits the NIRI to meet Requirement 111. If good design practice dictates, a means of dressing these lines to a length appropriate for different ports, or lines of different lengths for different ports, shall be provided.

 

153 Signal, Control, and Data Line Flexibility

The signal, control, and data lines to the Cassegrain Rotator Utility Box shall be flexible enough to permit easy routing, connection, disconnection, and dressing for operation.

 

Notes and Comments

  1. The ICD 1.9/3.8 contains references to all but the video LAN and Interlock System.
  2. There is also an auxiliary boot RS-2332 to each instrument IOC control. Control, Time, Synchro and Event LANs are in/out connector pairs.

 

160 Liquid Nitrogen Interface

The NIRI shall be provided with interfaces for adding liquid nitrogen for cool down when the instrument is on the ISS at the telescope.

Notes and Comments

  1. It is not anticipated that LN2 will be added through the ISS. This requirement is intended to provide for cool down of the instrument via a separate set of connections when the NIRI is on the telescope.
  2. Addition of LN2 is likely to be by hand carried dewars.
  3. No LN2 interface currently exists.

 

170 Vacuum Interfaces

The NIRI shall be provided with interfaces for the connection of vacuum lines when the instrument is attached to the ISS at the telescope.

Notes and Comments

  1. It is not intended to provide vacuum lines in the ISS. This requirement is to provide for the ability to evacuate the NIRI when the instrument is attached to the ISS at the telescope.
  2. Under normal conditions the instrument will be evacuated in the pump room. If necessary, portable equipment will be used to evacuate the NIRI at the telescope.
  3. No vacuum interface currently exists.

 

200 Control Systems Interfaces

 

210 Observatory Control System Interface

(TBD)

Notes and Comments

  1. The Observatory Control System Interface is covered by ICD 1.1.11/1.9.

 

220 Telescope Control System Interface

The Gemini-supplied OIWFS array controller shall be integrated with the Gemini Telescope Control System.

 

Notes and Comments

  1. Although Gemini provides both the OIWFS array controller and the Telescope Control System, and must demonstrate that these items work together, the NIRI team must integrate the OIWFS array controller into the NIRI and make it work in the instrument environment at the ISS.
  2. The Telescope Control System must provide a coordinate position for the OIWFS pick-off with respect to the NIRI coordinates.
  3. Currently there are three ICDs shown for the OIWFS: Intro, 1.10; Cooling, 1.10/3.6 and Cables 1.10/3.8.

 

230 Engineering Interface

The NIRI shall provide a means for command and control of NIRI mechanisms and science array controller, and data capture from the science array without the need for having Gemini control systems (i.e., the Observatory Control System and the Telescope Control System) present or connected.

 

231 Physical Interface

The Engineering Interface shall use the same model and configuration of workstation as that used for the Instrument Control System that runs with other Gemini control systems.

 

232 User Interface

To the extent practicable, the user interface in the Engineering Interface should appear to a user to be very similar to the user interface in the Instrument Control System.

 

233 Command and Control

The Engineering Interface shall be capable of commanding and controlling all NIRI mechanisms and reading status from all NIRI sensors.

 

234 Data Capture

The Engineering Interface shall be capable of capturing data from the NIRI. This will not include wavefront data.

 

Notes and Comments

  1. It is expected (but not required) that the Engineering Interface would use at least a part of EPICS in its implementation.
  2. Not all data readout modes need be supported. The data that is captured may require extensive processing normally done by the NIRI Instrument Control System or the Gemini Data Handling System to be intelligible. There is no requirement for the Engineering Interface to perform this data processing, which may be done off-line on another system to analyze results.

 

240 Interlock System Interface

(TBD)

Notes and Comments

  1. No NIRI interlocks require a complete stop of the telescope.
  2. Some local interlocks should immediately notify the operator that the NIRI has shut down. For example: a helium failure or overheating of the electronics.
  3. The physical interface is described in ICD 1.9/3.8.

 

250 Events Bus Interface

(TBD)

Notes and Comments

  1. The exact nature of the Events Bus Interface to the NIRI is not understood at this time.
  2. The physical interface is included in ICD 1.9/3.8.

 

260 Synchro Bus Interface

(TBD)

Notes and Comments

  1. The exact nature of the Synchro Bus Interface is not understood at this time.
  2. The physical interface is included in ICD 1.9/3.8.
  3. The Synchro Bus In/Out Connector is dual SC fiber.

 

270 Time LAN Interface

(TBD)

Notes and Comments

  1. The NIRI will interface with the Time LAN for images.
  2. The physical interface is included in ICD 1.9/3.8.
  3. The Time LAN to IOC thermal enclosure is BNC in and BNC out.

 

280 reserved

 

290 General Control System Requirements

The NIRI shall meet all general control system requirements given below.

 

291 Operability

All filters, slides, mechanisms, and other controllable features of the NIRI shall be controllable by computer through the standard EPICS control paths from the Instrument Control System.

 

292 Configuration Time

The goal for configuration of the NIRI for an observation from any previous observation configuration is 3 minutes or less.

 

Notes and Comments

  1. Besides being controllable from the ICS, the dark slide can be moved by hand, to permit closing it manually in the event of a loss of power to the instrument.

 

300 Array and Array Controller Interfaces

 

310 Science Detector Array Interface

The NIRI design shall make provision for the Gemini-furnished InSb science detector array.

 

311 Characteristics

The NIRI shall be designed to take the fullest possible advantage of an InSb detector with the following characteristics:

 

312 Mechanical Interface

(TBD)

 

313 Thermal Interface

(TBD)

 

314 Optical Interface

(TBD)

Notes and Comments

  1. Both the array and array controller are furnished by Gemini. Therefore, the interface between the array and its controller is not described in this document, as that interface is not the responsibility of the NIRI team. Size, weight, and mechanical connection information concerning the array are required.
  2. The NIRI requires information on the number of electronics boards and racks required for the array and array controller. Information is required on the length of cable runs and the maximum distance between the array and the preamp.
  3. An estimate of heat dissipation and power requirements for the array electronics is required.
  4. The detector ICD is 1.9.2
  5. The detector controller ICD is 1.9.3.
  6. The Instrument Components Controller ICD is 1.9.4.
  7. The Instrument Sequencer ICD is 1.9.5.

 

320 Science Array Controller Interface

The NIRI design shall make provision for the Gemini-furnished science array controller.

 

321 Mechanical Interface

(TBD)

 

322 Thermal Interface

(TBD)

 

323 Optical Interface

(TBD)

Notes and Comments

  1. Both the array and array controller are furnished by Gemini. The interface between the two, the cables and wiring in the dewar, are part of the instrument. Specifications for the wires and cables need to be developed and communicated to the NIRI team.

 

330 Data Handling System Interface

(TBD)

Notes and Comments

  1. This may be part of the software for the Aladdin project.
  2. The physical interface is included in ICD 1.9/3.8.

 

340 OIWFS Detector Array Interface

(TBD)

Notes and Comments

  1. The interface between the OIWFS and NIRI is very critical in defining the overall configuration of the instrument. Early definition of this interface requirement is essential for maintaining the NIRI schedule.
  2. The OIWFS ICDs are:

 

350 OIWFS Array Controller Interface

(TBD)

Notes and Comments

  1. The interface between the OIWFS and NIRI is very critical in defining the overall configuration of the instrument. Early definition of this interface requirement is essential for maintaining the NIRI schedule.
  2. The OIWFS ICDs are:

 

360 Telescope Control System Interface

(TBD)

 

400 Environmental Requirements

 

410 Altitude Environment

The NIRI shall be capable of being transported, stored, and operated in a wide range of altitude environments.

 

411 Transportation Altitudes

The NIRI shall be capable of being transported at any altitude between -70 m and 4,200 m by any transportation mode. The NIRI shall be capable of being transported by commercial jet with pressurized cargo compartments at altitudes up to 15 Km.

 

412 Storage Altitudes

The NIRI shall be capable of being stored in or out of its shipping container at any altitude between -70 m and 4,200 m.

 

413 Operation Altitudes

The NIRI shall be capable of being operated at any altitude between -70 m and 4,200 m.

 

Notes and Comments

  1. The NIRI must work at the Hilo Base Facility, at an altitude of approximately sea level, and at the telescope on Mauna Kea.

 

420 Temperature Environment

 

421 Operational Environment

The NIRI operational environment shall be limited to -15 to +25 oC.

 

422 Survival Environment

The NIRI shall be capable of surviving a temperature range of -20 to +50 oC without damage.

 

423 Transport Environment

The NIRI shall be capable of withstanding without damage a temperature range of -20 to +50 oC during transport without damage.

 

430 Humidity Environment

The NIRI shall be capable of being transported and stored, in a wide range of altitude environments in the range 0 to 100% relative humidity, with condensing moisture.

Notes and Comments

  1. Operation of the GNIRS at high relative humidity levels will cause condensation on the dewar window. Using heaters on the window or a hot air system are incompatible with the thermal management of the telescope. Dry, ambient temperature air will be provided in the ISS for window flushing.

 

440 Vacuum Environment

If required by good design practice, the NIRI shall maintain a vacuum inside the dewar.

 

441 Creating the Vacuum

The NIRI shall provide a means to evacuate its dewar while the instrument is on its handling rig in the instrument support area, and while it is attached to the ISS.

 

442 Vacuum Quality and Duration

The NIRI shall be capable of being kept cold and operated without measurable degradation of scientific performance for 3 months. If needed the instrument shall be capable of being kept at room temperature without contamination of the detector or internal optics significantly affecting the scientific performance, for at least 3 months without pumping.

Notes and Comments

  1. Early Gemini documentation mentions a vacuum line in the ISS utility services box. This is no longer being provided. Instead, instruments will be pumped down in the instrument support facility, then transported to the telescope.
  2. Operating vacuum may only be obtained with a cold instrument. The facility requires that the cryogenic cooldown system be disconnected during operation on the telescope.

 

450 Mechanical Environment

The NIRI shall be capable of operating in the mechanical environment of the Gemini telescopes and their base facilities, and shall be capable of withstanding shipment among Tucson, Mauna Kea, and Cerro Pachon.

 

451 Telescope Slew Rates

The NIRI shall be capable of withstanding slew rates of 2° per second in azimuth and 0.75° per second in elevation, or any combination of these, along with rotation of the Cassegrain rotator to maintain alignment with the parallactic angle as it changes at these slew rates. All optics and mechanisms shall meet their flexure and alignment specifications at these rates.

 

Notes and Comments

  1. The rotator requires faster slew rates than specified for maintaining parallactic angle.

 

500 Optical Requirements

 

510 Science Requirements

The NIRI shall meet all science requirements listed below.

 

511 Wavelength Range

The NIRI shall operate as a camera with grism spectroscopy and polarimetry option in the wavelength range 0.9 m m through 5.5 m m.

 

512 Detector Format

The NIRI shall be designed to use an InSb science detector array with a format of 1024 x 1024, with 27 m m square pixels. NIRI must be able to operate in all essential scientific modes with an only partly functional detector array. The design should allow an upgrade to a potential future larger InSb detector array.

 

513 Spectral Resolution

The GNIRS shall provide a low dispersion mode with R = 2000 that permits most atmospheric windows to be covered by the detector array. The GNIRS shall also provide an intermediate dispersion mode with R ³ 4000.

 

514 Pixel Scale

The NIRI shall provide three pixel scales:

 

515 Slit Length

The NIRI shall provide a selection of entrance slits with a length of approximately 120 arcsec for grism spectroscopy.

 

516 Polarizing Prism

The NIRI shall incorporate a polarizing prism and an appropriate focal plane mask for imaging polarimetry.

 

Notes and Comments

  1. There is no need for an on-instrument calibration source. Gemini will provide a calibration source on the ISS that can be fed to the NIRI.
  2. Image parity is not a concern, so a fold mirror may be introduced anywhere in the optical path.
  3. IGPO will provide the detector arrays and array controllers.

 

520 Science Options

Spectroscopic capability in the 3 micron window is a desirable option.

 

530 Image Quality and Optical Tolerances

The image quality philosophy of the NIRI shall be that the Imager does not degrade the tip-tilt corrected image quality delivered by the telescope significantly when used in the 0.12"/pix and 0.05"/pix modes. In the 0.02"/pix mode, the image quality delivered by the AO system should not be degraded significantly. This is interpreted as a requirement that 85% of the geometric traytrace spots fall within one pixel for the design.

 

531 Alignment

The ability to accurately align the instrument with the telescope is critical to minimizing background flux. A means of establishing alignment shall be provided.

 

532 Focus

While all modes of operation shall be nominally confocal, minor focus adjustments depending on wavelength, pixel scale, or choice of filters are acceptable to control chromatic effects.

 

540 OIWFS Feed

The NIRI shall provide an optical feed inside the cryostat compatible with the operation of the On-Instrument Wavefront Sensor module supplied by Gemini.

 

541 Beam Characteristics

(TBD) with a plate scale corresponding to 0.2" pixels. The optics inside the NIRI in the path to the OIWFS shall distort the beam fed to the GNIRS by the Gemini telescope no more than 60 nm rms.

 

542 Field Curvature

The beam feed optics shall be designed assuming the telescope is providing the NIRI its normal curved field uncorrected by adaptive optics.

 

543 Wavelength Sensitivity

The OIWFS beam shall contain as much of the energy from the telescope beam in the wavelength range of 1 m m to 2.5 m m as it is practical to provide.

 

Notes and Comments

  1. The purpose of the OIWFS is to provide feedback to the fast tip/tilt and focus correction control loops. The OIWFS will always provide telescope flexure correction. It may provide a fast tilt source for adaptive optics.

 

550 Target Acquisition

The NIRI shall provide a means for simple target acquisition.

 

551 Target Complexity

The NIRI shall provide a means for locating the slit or the polarization mask on single stars, specific features, and complex fields.

 

560 Baffling

The NIRI shall provide baffling of ambient thermal radiation and radiation from field sources other than the scientific target with the goal of minimizing the impact of such radiation of the detection of the scientific target.

 

561 Thermal Baffling

The NIRI shall contain sufficient thermal baffling to manage heat loading on the cryogenic systems within the limits of good design practice.

 

562 Optical Baffling

The NIRI shall contain proper optical baffling to reduce stray radiation. The goal is to minimize the impact of stray radiation on the scientific observations. It is recognized that there are observing situations where, despite best design efforts, stray light will be the dominant source of noise. An example might be the attempts to detect planets around bright stars.

 

570 Internal Instrument Background

The NIRI shall have an internal instrument background less than either the natural background from the observed science field or the dark current of the detector, whichever is greater.

 

580 Throughput

In the design of NIRI, strong emphasis shall be put on achieving high throughput, so that the qualities of the Gemini telescope and the site can be exploited to the maximum extent possible.

 

581 Vignetting

The NIRI design shall properly consider vignetting, including diffraction effects.

 

582 Signal-to-Noise Ratio

The NIRI shall be designed to maximize signal-to-noise ratio.

 

590 General Optical Requirements

The NIRI shall meet the general optical requirements listed below.

 

591 Lyot Stop

The NIRI shall provide a cold Lyot stop at an image of the telescope pupil (the secondary mirror). The Lyot stop shall be capable of being changed and adjusted when the instrument is off the telescope and warmed up.

 

592 Coatings

The following characteristics of all optical coatings shall be specified in design documentation:

All coatings shall be unaffected by repeated thermal cycling over the operating, storage, and transportation temperature ranges.

 

593 Vacuum Environment

All optical components and coatings shall meet all performance requirements when operated in a vacuum of less than 10-5 Torr at operational temperatures.

 

594 Thermal Cycling

All optical components and coatings shall meet all performance requirements when thermally cycled at a maximum rate of temperature change of 0.25 K/minute.

 

Notes and Comments

  1. Durability of coatings will be given by ISO or Mil-Spec.

 

600 Mechanical Requirements

 

610 Rigidity

The NIRI shall be designed to be rigid, and to meet all the requirements listed below.

 

611 Alignment of the Instrument to the Telescope Optics

The alignment of the NIRI cold stop with the secondary mirror shall be set and maintained to better than 1% of the apparent secondary mirror diameter.

 

611 Tracking with the OIWFS

Tracking performance when using the NIRI OIWFS shall be (TBD -- make it consistent with the error allocation given in the Gemini System Error Budget Plan and flexure with respect to feed slit.).

 

612 Tracking with the Peripheral Wavefront Sensor

Tracking performance when using the peripheral wavefront sensor is (TBD - flexure to be with respect to ISS).

 

620 Mechanical and Thermal Tolerances

 

Notes and Comments

  1. Mechanical stability of all mechanical components is dependent on the optical tolerance analysis given in section 530. The translation from section 530 to the mechanical tolerances is given in the table below.

 

Mechanical Tolerances in Alignment

 

 

Gravity Effects

Thermal Effects

Offner Optic

(TBD)

(TBD)

Grating Turret

(TBD)

(TBD)

X-Dispersion Turret

(TBD)

(TBD)

Collimator

(TBD)

(TBD)

Camera & Detector

(TBD)

(TBD)

Filter Wheel, Pre-Slit

(TBD)

(TBD)

Filter Wheel, Post-Slit

(TBD)

(TBD)

OIWFS

(TBD)

(TBD)

Slit Wheel

(TBD)

(TBD)

 

630 Thermal Performance

Notes and Comments

  1. Thermal effects due to temperature gradients (TBD) outside the dewar, inside the dewar, and near the detector shall be considered in the design of the NIRI.
  2. Thermal transient effects during cool-down or warm-up shall be considered in the design of the NIRI.

 

640 Space Requirements

 

644 Electronic Enclosures

All NIRI electronic enclosures mounted on the ISS shall be counted in the space requirements given above.

 

645 Access to Electronic Enclosures

The electronic enclosures shall be accessible without removing the NIRI from the ISS.

 

646 Access to Vacuum Ports

Vacuum ports on the NIRI shall be accessible without removing the instrument from the ISS.

 

646 Access to Liquid Nitrogen Ports

Liquid nitrogen ports on the NIRI shall be accessible without removing the instrument from the ISS.

 

647 Access to Helium Ports

Helium ports on the NIRI shall be accessible without removing the instrument from the ISS.

 

648 Mechanical Connections

All mechanical connections on the NIRI shall be accessible without removing the instrument from the ISS and while mounted with other instruments.

 

Notes and Comments

  1. Space requirements are specified in ICD 1.1.1/1.9 and the ICD for the ISS (/1.9).

 

650 Mass and Center of Gravity Requirements

The NIRI shall meet all mass and center of gravity requirements listed below.

 

651 Total Mass

The NIRI shall have a mass of 2000 kg ± 100 kg.

 

652 Center of Gravity

The NIRI shall have a center of gravity on the port axis 1000 mm ± 100 mm from the mechanical interface on the ISS.

 

653 Balance Tolerance

The out-of-balance during operation due to moving elements, fixtures, (including LN2 boiloff) etc. within the NIRI shall be less than 400 N-m.

 

654 Ballast Weight

A ballast weight and its supporting structure shall be supplied as required to meet the above requirements.

 

655 Electronic Enclosures

All NIRI electronic enclosures mounted on the ISS shall count in the mass and center of gravity requirements given above.

 

660 Cooling System

The NIRI shall meet all cooling system requirements listed below.

 

661 Cooldown Time

The NIRI cooling system shall have the capability to cool the instrument from room temperature to operating conditions in 48 hours or less. Liquid cryogens are permitted to be used to meet this requirement, but may not be used to maintain the operating temperature for extended periods once it is achieved. Cryogenic closed cycle coolers shall be used to maintain the operating temperature once it has been achieved.

 

662 Warmup Time

The NIRI shall not require more than 24 hours to warm up the entire instrument from operating conditions to room temperature.

 

663 Thermal Stability

The NIRI detector assembly shall have an active temperature control system providing a variable accuracy to be set at the optimum temperature for the detector between 30 K and 40 K, and a stability of +/- 0.1 K.

 

664 Vibration

Adequate measures shall be taken to ensure that the use of cryogenic closed cycle coolers shall not introduce sufficient vibrations into the mechanical structure to prevent meeting all rigidity, alignment, tracking, and other performance requirements.

 

Notes and Comments

  1. It may require as much as 1000 liters of liquid air or liquid nitrogen to meet Requirement 661. It is expected that Gemini is prepared to supply the required liquid cryogens at the appropriate rate in the instrument support area or on the observatory floor to meet this requirement.
  2. The sum of cool down and warm up times shall be less than 72 hours.

 

670 Vacuum System

671 Staging and Holding Areas

(TBD)

 

672 Vacuum Pump Capacity and Selection

(TBD)

 

673 Operating Procedure and Set-Up

(TBD)

 

674 Test Set-Up

(TBD)

 

680 Operational Requirements for Mechanisms

NIRI mechanisms shall meet the requirements listed below.

 

681 Safety

No mechanism shall be back-driveable in the event of loss of electrical power.

 

682 Time to Function

The goal for all individual mechanisms is to take no more than 60 seconds to operate from any position to any other position.

 

690 Instrument Handling

The NIRI shall be delivered with an instrument handling rig that can hold the NIRI during installation on the ISS. The instrument handling rig shall also hold the NIRI during storage and will provide assistance during assembly and disassembly.

 

Notes and Comments

  1. The handling rig is intended to be used for instrument storage, safe movement around the instrument preparation and assembly areas, and for assembly and disassembly assistance. Consult the Instrumentation Control Document, Section 3.2.
  2. Instruments are mounted on the ISS using the Cassegrain handling rig (supplied by Gemini). An instrument will be moved from the storage/preparation area in the facility to the observing floor via the service lift of the large lifting platform. Once on the observing floor, the instrument will be transferred from its handling rig to the Cassegrain handling rig. Depending upon the ISS port that the NIRI is to occupy (side- or up-looking port), the NIRI handling rig will orient the instrument in the proper configuration before transfer to the Cassegrain rig, which is a maneuverable lifting platform. The NIRI will then be maneuvered to the intended port by the Cassegrain handling rig, positioned, and the NIRI load bearing fasteners will be engaged (dowels or expanding bolts), followed by the load bearing clamping fasteners (clearance bolts). The position of location and load bearing fasteners is outlined in the Critical Design for the Cassegrain Assembly. Each consists of a circular raised boss with an annular flat surface. At the center of the surface is a locating counterbore with a tapped hole further in. More guidance regarding the Cassegrain handling rig and the general scheme for mounting instruments can be found in the Instrumentation Control Document, Section 8.1.
  3. A handling rig usable in all telescope orientations is likely to be very large, complex and extremely expensive. It is anticipated that the NIRI will be installed in the zenith pointing position of the telescope.

 

6A0 Metric Dimensioning

Metric dimensions shall be used in the NIRI.

 

6A1 Metric Dimensions on Drawings

Metric dimensions in millimeters shall be used in all as-built drawings, with dimensions called out to 0.01 mm.

 

6A2 Metric Fasteners

All screws, bolts, nuts, tapped holes, and fasteners shall be of standard metric sizes, and called out as such on the as-built drawings.

 

Notes and Comments

  1. This requirement permits the use of "soft metric" design, in which, e.g., two holes are spaced 4 inches apart by the designer. The fabrication drawings may show dimensions in inches to reduce confusion and retooling costs, but the as-built drawings will be converted before delivery to metric dimensions, e.g., 4 inches will be shown as 101.60 mm.

 

700 Electrical and Electronic Requirements

 

710 Electronic Design Requirements

The NIRI shall be designed in accordance with modern electronics engineering practice for astronomical instruments.

 

711 Grounding and Shielding

Separate ground returns shall be provided for low level signals, noisy components such as relays and motors, and hardware components such as mechanical enclosures, chassis, and racks.

 

712 Electrostatic Discharge

The NIRI design shall protect sensitive components from electrostatic discharge.

 

Notes and Comments

  1. Good grounding practice is discussed in Ott, Henry W., Noise Reduction Techniques in Electronic Systems, Second Edition, AT&T Bell Laboratories, 1988, Chapter 3.
  2. Ott (above) discusses electrostatic discharge on page 332.

 

720 Cassegrain Cable Wrap Interfaces

Notes and Comments

  1. Cassegrain cable wrap interfaces are provided by the break out panels on the ISS, and should be defined by the ICD 1.5.2/1.9.

 

730 Temperature Monitoring

Thermocouples (or gas thermometers) are required to monitor the cryo environment within the dewar and the detectors

 

731 Temperature Sensor Locations

(TBD)

 

732 Sensor Interfaces

The temperature sensor read-out interface shall be part of the Engineering Interface as described in section 234.

 

Notes and Comments

  1. The NIRI will have a variety of temperature sensors inside the dewar and between the radiation shields.
  2. The NIRI detector will be provided with temperature sensors, at least 2 for the mount and 2 for the detector.
  3. The GNIRS electronics temperature is monitored by the Gemini thermal enclosure system.

 

800 Software Requirements

 

810 Software Design Requirements

The NIRI shall be a "conforming" instrument, in that it shall use EPICS and conform to Gemini software and control system standards and the requirements listed below.

 

811 Use of EPICS

The NIRI shall use a standard Gemini configuration of a workstation for the operator interface, connected to an EPICS based system used for controlling motors, coolers, and heaters and for receiving status information from sensors.

 

812 EPICS System

The EPICS system shall be a standard Gemini unit (VME crate, 68040 CPU, VxWorks operating system.

 

813 Use of the Core Instrument Controller Software Package

The NIRI software engineers shall use the Gemini-furnished Core Instrument Controller Software Package to develop the Instrument Control System (ICS).

 

Notes and Comments

  1. The Gemini Software Design Description contains guidelines for developing Gemini-compatible software.
  2. Gemini will provide the NIRI team with a Core Instrument Controller Software Package to aid in the development of an ICS that conforms to Gemini requirements and standards.
  3. The current version of EPICS workstation is not VME compatible.

 

820 EPICS Compatibility

The NIRI software shall be based on and use an EPICS system as required by 810.

 

821 Interfaces to the Gemini System

Interfaces to the Gemini system shall conform to the descriptions presented in the Core ICS documentation. In particular, all OCS commands to, and responses from, the NIRI shall be by CAD, CAR and SIR EPICS records as described in the Core ICS documentation. Interfaces to other Gemini subsystems shall conform to the relevant Interface Control Documents.

Notes and Comments

  1. Low level software in the NIRI will be a mixture of EPICS code and C-coded tasks, both running directly on VxWorks.

 

830 Gemini Furnished Software

Gemini shall furnish a complete and final set of all Interface Control Documents not later than the NIRI PDR.

Gemini shall furnish to the NIRI software engineers a functional CICS (see 813) as soon as practical, and shall provide updates as they become available. The first release of the CICS should be by NIRI PDR with general information available before then.

Gemini shall furnish a complete interface description of the detector sub-system as soon as practical.

Gemini shall furnish a complete interface description of the OIWFS sub-system as soon as practical.

Gemini shall furnish a DHS (or a simulation thereof) when the detector subsystem is delivered.

 

900 Other Requirements

 

910 Documentation

The NIRI shall be delivered with adequate documentation to facilitate the operation, maintenance, and repair of the instrument.

 

911 User’s Manual

The User’s Manual shall be written to enable a new user of the NIRI to easily get acquainted with the operation of the instrument.

 

912 Service and Calibration Manual

 

913 Software Maintenance Manual

 

914 As-Built Drawings

The as-built drawings shall show all dimensions in millimeters, down to 0.01 mm. All fasteners specified in these drawings shall be standard metric sizes. All drawings shall otherwise be to IfA standards used in instruments of similar size, function, and complexity.

 

915 Drawing Standards

(TBD)

 

916 Drawing Numbering System

(TBD)

 

917 Drawing Filing System

(TBD)

Notes and Comments

  1. It is anticipated that ANSI specifications will be used for final drawings.
  2. Final released drawings will be maintained by IGPO.

 

920 Training

The NIRI development team shall provide training documentation and a training course to Gemini operations personnel on the operation, maintenance, and repair of the NIRI.

 

930 Reliability

The NIRI shall be designed and built to be reliable.

 

931 Downtime

The NIRI shall have a total downtime of 2%, with 1% as a goal. Where possible, component failure shall result in gradual performance degradation. Single point failures that may result in significant downtime shall be determined and, where necessary, critical spares shall be identified.

 

932 Continuous Duty

The NIRI shall be designed and built for continuous operation. Modules containing moving parts, e.g., cryocooler cold heads, shall be designed or selected to meet Requirement 931 assuming continuous operation.

 

940 Maintainability and Serviceability

The NIRI shall meet the requirements for maintainability in the Instrumentation Control Document, Section 2.2.

 

941 Standard Components

Wherever possible, the NIRI shall use unmodified commercially available standard components.

 

942 Modularity

To the extent possible, the NIRI shall be designed to be modular.

 

943 Access

Access to components and subassemblies shall be considered in the NIRI design, particularly for those elements that are accessed frequently. Tool and hand clearances shall be considered, as well as space required to remove modules, visual access to components (or a means to feel their correct position and alignment, e.g., for electronic connectors).

 

944 Alignment

Alignment of optical components shall be achieved to the extent possible by accurate machining of locating fixtures.

 

945 Relative Equipment Arrangements

Equipment shall be located with due consideration of the sequence of operations involved in maintenance procedures. To the extent possible, the most accessible locations shall be reserved for the items requiring most frequent access.

 

946 Subassemblies

Subassemblies of the equipment that require more frequent service (inspection, adjustment, repair, or replacement) shall be configured as plug-in modules or, if in racks, as drawers that can be withdrawn easily.

 

947 Handling

Modules greater than 20 kg in mass shall have suitable handles for use in removing, replacing, and carrying them. Handles shall be located such that the vector sum of resultant handling forces shall pass close to the center of gravity of the unit.

 

948 Revisability

Multilayer electronic boards shall not be used unless they are replaceable as a module. Backplane interconnections between custom boards is discouraged.

 

Notes and Comments

  1. Requirement 944 can be achieved by machining captive thick shims to achieve the assembled tolerances, but the intention is to avoid an involved re-alignment procedure on assembly or re-assembly.

 

950 Lifetime

The NIRI shall be designed for an operational lifetime of 10 years without a major overhaul. Components likely to affect the lifetime requirement shall be identified.

Notes and Comments

  1. Battery back-up systems will require replacement at intervals of less than 10 years.

 

960 Safety