| Status and availability: |
FLAMINGOS-2 is is expected to undergo commissioning and System Verification during 2007, and to be
available for public queue and classical observing beginning in Semester 2008A. |
| Modes of operation: |
FLAMINGOS-2 has three instrument modes, each of which can be used with or without MCAO:
- Imaging
- Long-slit spectroscopy
- Multi-object spectroscopy
More detail on these capabilities may be found in the F-2 Components section.
|
| FLAMINGOS-2 Components: |
See the F-2 components
page for details of filters,
grisms, detector and other components. |
| Observing strategies: |
Detailed observing strategies will be developed during instrument commissioning |
| Phase II Preparations: |
All phase II preparations will be done with
the Observing Tool (OT). The FLAMINGOS-2 OT component is not yet
available. |
| Observing overheads: |
To be determined during commissioning.
|
| Target acquisition: |
See the generic target
acquisition scenarios. |
| Calibration: |
Spectral flat-fielding and wavelength calibration of
FLAMINGOS-2 spectra are to be carried out using the facility
calibration unit.
The requirements for baseline and special calibrations will be
determined during commissioning
|
| Data processing and software: |
At present, the Gemini IRAF package does not include a subpackage for FLAMINGOS-2
data processing. Much of the reduction will be carried out with the generic
MOS/longslit package, which is still under development. |