A minimum of 90% of the time will be
made available for science use in 2007A. This amounts to 163 nights,
and includes "Compensatory Time" to the UK in return for the long-term
transfer of Michelle to Gemini, and Gemini staff allocation. No
additional system verification or demo science time is currently
planned for Gemini North in 2007A. The number of hours allocated
to each partner is given in the following table.
Partner
Estimated Hours Available
US
576
UK
403
Canada
214
Australia
83
Argentina
29
Brazil
17
Univ. of Hawaii (host)
173
Gemini
Staff
133
Total
1628 (=163n)
Gemini South: Time Availability and Distribution
Due to the major instrument
commissioning activities expected in 2007A for NICI and Flamingos-2,
as well as other engineering work, in semester 2006B a minimum of 70%
of the time will be made available for science use, or 127
nights. This fraction includes 12 nights reserved for the start
of the NICI Planet Search Campaign, 6 nights for Flamingos-2 system
verification and the Gemini staff time allocation. The number of
hours allocated to each partner is given in the following table.
Partner
Estimated Hours Available
US
378
UK
263
Canada
136
Australia
47
Argentina
19
Brazil
17
Chile (host)
139
Gemini Staff
89
NICI Campaign Science
120
Flamingos-2 SV
60
Total
1268 (=127n)
Time Adjustments
To
maintain overall balance amongst the partnership, the values shown
above for both Gemini North and South have been
adjusted from the nominal partner shares as a result of actual time
charged through 2006A. The time allocations shown here were
approved at the Operations Working Group meeting in August 2006.
In addition, an exchange of 5 hours
between Canada (+5hr on GN) and Brazil (+5hr on GS) is included.
The number of nights is approximated by int(hours/10).