Gemini Documentation - Specifications
- SPE-PS-G0001. Gemini Science Requirements Document, 1-Nov-96 (PS) (PDF)
- SPE-TE-G0002. Telescope Design Requirements, 18-Nov-92 (PS) (PDF)
- SPE-I-G0003. Cassegrain Assembly Functional Requirements, 18-Nov-92(PS) (PDF)
- SPE-O-G0005. Specifications, Generated ULE Meniscus, 31-Dec-92 (PS) (PDF)
- SPE-O-G0006. Specifications, Primary Mirror Polishing, 31-Dec-92 (PS) (PDF)
- SPE-ASA-G0008. Gemini Electronic Design Specification, 23-Feb-94 (PS) (PDF)
- SPE-C-G0009. Software Programming Standards, 22-Mar-93 (PS) (PDF)
- SPE-C-G0011. Software Configuration Control Plan, 31-Mar-93 (PS) (PDF)
- SPE-TE-G0012. Enclosure Design Requirements Requested Document, 12-Apr-93 (PS) (PDF)
- SPE-TE-G0013. Enclosure Base, Support Facility, & Site Work Design Requirements Requested Document, 12-Apr-93 (PS) (PDF)
- SPE-C-G0014. Software Requirements Specification, 17-May-95 (PS) (PDF)
- SPE-C-G0015. Operational Concept Definition, 19-Aug-94 (PS) (PDF)
- SPE-O-G0019. Design Requirements Document for the Gemini M1Cell Assemblies, 28-Jun-93 (PS) (PDF)
- SPE-C-G0026. Goals and Requirements for Software and Controls, 23-Aug-93 (PS) (PDF)
- SPE-C-G0027. Software Concept Specification, 23-Aug-93 (PS) (PDF)
- SPE-C-G0037. Software Design Description, 09-Sep-94 (PS) (PDF)
- SPE-C-G0038. Controls Work Package Description Outline, 09-Sep-93 (PS) (PDF)
- SPE-O-G0039. Functional Specification, f/16 Secondary Mirror Tilt System, 21-Dec-95 (PS) (PDF)
- SPE-S-G0041. Gemini System Error Budget Plan, 2-Jan-97 (PS) (PDF)
- SPE-TE-G0043. Functional Specification for the Gemini Coating Plant, 23-May-94 (PS) (PDF)
- SPE-S-G0046. Reliability & Maintainability Plan, 10-Jun-94(PS) (PDF)
- SPE-S-G0048. Thermal Management System, 28-Jun-94 (PS) (PDF)
- SPE-PS-G0050. Instrumentation Program Plan, 23-May-94 (PS) (PDF)
- SPE-I-G0052. Cassegrain Assembly Design Requirements, 03-May-94 (PS) (PDF)
- SPE-C-G0053. Mount Control System - Package Requirements Specification, 19-Jan-95 (PS) (PDF)
- SPE-PS-G0054. Facility Calibration Unit Functional Requirements, 1-Mar-94 (PS) (PDF)
- SPE-TE-G0055. Primary Mirror Cell Cart Design Requirements Specification, 12-Jun-95 (PS) (PDF)
- SPE-I-G0056. Array Controller Performance Requirements Specification
- SPE-O-G0057. M2 Positioning System Design Requirements Document, 23-Aug-95 (PS) (PDF)
- SPE-O-G0058. M2 Deployable Baffle Design Requirements Document, 23-Aug-95 (PS) (PDF)
- SPE-O-G0059. Functional Requirements for the f/16 Secondary Assembly, 14-Sep-95 (PS) (PDF)
- SPE-O-G0060. Design Requirements Document, M2 Positioning Mechanism Suspension Bearings, 8-Jan-96 (PS) (PDF)
- SPE-C-G0061. Instrument Science Requirements, 27-Jan-96 (PS) (PDF)
- SPE-O-G0063. Description of Algorithms to Control Primary Mirror Position, 24-Jul-96 (PS) (PDF)
- SPE-C-G0064. PCS Preliminary Software Design Description, 04-Dec-95 (PS) (PDF)
- SPE-O-G0065. DRD, Primary Mirror Lifting Fixture, 3-Apr-96 (PS) (PDF)
- SPE-C-G0069. MCS Control System Design Description, 25-Nov-96 (PS) (PDF)
- SPE-C-G0070. Gemini Record Reference Manual, 30-Jan-97 (PS) (PDF)
- SPE-C-G0073. Gemini Engineering Archive Requirements, 5-Nov-97(PS) (PDF)
- SPE-I-G0074. Programmatic Requirements for Gemini Instrumentation Development, 10-Dec-97 (PS) (PDF)
- SPE-C-G0076. Integration Time Calculator, 17-Jun-98 (PS) (PDF)
- SPE-C-G0077. Weather Server Software Specification, 03-Aug-98 (PS) (PDF)
- SPE-TE-G0078. Primary mirror covers assembly procedure, 04-Aug-98
- SPE-TE-G0079. Azimuth Cable Wrap assembly procedure, 31-Aug-98
- SPE-TE-G0080. Primary Mirror Cell Cart assembly procedure, 02-Sep-98
- SPE-TE-G0082. Altitude Cable Wrap assembly procedure, 08-Sep-98
- SPE-PS-G0083. GMOS Mask Design Software Requirements, 12-Jul-99
- SPE-PS-G0086. Phase 1 XML Specification, 16-Sep-99. (PDF)
- SPE-AO-G0094. Request for Proposal for a Laser for the Mauna Kea Adaptive Optics system, 02-Feb-00 (PDF)
Virginia M. Smith / web@gemini.edu / July 22, 2002