Gemini Documentation - Program Guides
- PG-S-G0001. Approval Authority, revision B, 01-Jan-97 (PS) (PDF)
- PG-S-G0002. Gemini Document/Drawing Control Plan, Revision E1, 04-Aug-99 (PS) (PDF)
- PG-S-G0003. Change Control
- PG-S-G0004. Standards
- PG-C-G0005. Software and Controls Management Plan, 5-Apr-93 (PS) (PDF)
- PG-S-G0006. Gemini Design Review Guidelines, 30-Mar-94 (PS) (PDF)
- PG-A-G0007. Gemini Contract Procedures.
- PG-S-G0008. Gemini Acronym Glossary, 5-Mar-96 (PS) (PDF)
- PG-PM-G0009. Gemini North Safety Program, 24-May-96 (PS) (PDF)
- PG-I-G0010. Gemini Instrument Site Safety Policy, 20-Aug-97 (PS) (PDF)
- PG-O-G0011. Safety Plan for M1 Cell Assembly Area at NFM Technologies, 20-Aug-97 (PS) (PDF)
- PG-HR-G0013. Moving Guide to Hilo, Hawaii, 1-June-02. (PDF)
- PG-HR-G0014. Gemini Visitor's Guide to the Summit, Rev 3.3, 3-March-03 (PS) (PDF)
- PG-PM-G0015. Gemini Relocation Policy for Gemini North, rev B, 31-Mar-97 (PS) (PDF)
- PG-PM-G0016. Gemini Relocation Policy for Gemini South, 02-Apr-98 (PS) (PDF)
- PG-PM-G0017. Gemini South Safety Program (English), 06-May-98 (PS) (PDF)
- PG-PM-G0018. Gemini South Safety Program (Spanish), 06-May-98 (PS) (PDF)
- PG-C-G0019. Engineering Backdoor for Gemini Instruments, 12-Jun-98 (PS) (PDF)
- PG-PM-G0021. Visitor's Guide to Cerro Pachon, 22-Oct-98. (PS) (PDF)
- PG-PM-G0024. Guidelines for Visiting Observers and Instrument Teams, 03-Mar-03. (PS) (PDF)
Virginia Smith / web@gemini.edu / March 19, 2003