You are here

2022A GS DDT Programs

Content owned by sleggett

The table below summarizes the Gemini South queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [22A] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2022A-DD-101 Sweet DD Rosetta Stones: assembling the red sequence at z=1. GSAOI+GeMS Adaptive Optics 5.00
Execution Status: Dates Taken:
20220416
Completion Status:
0%
GS-2022A-DD-102 De DD Confirmation of an exceptional Galactic stellar merger candidate GSAOI+GeMS Adaptive Optics / NIRI+AltairLGS 1.30
Execution Status: complete Dates Taken:
20220415
Completion Status:
100%
GS-2022A-DD-103 Chandler DD Discovery and Characterization of a Transitioning Main-Belt Comet GMOS-S 1.00
Execution Status: complete Dates Taken:
20220607
Completion Status:
100%
GS-2022A-DD-104 Sun DD Spectroscopic Follow-up of the Recurring Flare in ULIRG F01004-2237 GMOS-S 0.90
Execution Status: complete Dates Taken:
20220606 20220609 20220619 20220703
Completion Status:
100%
GS-2022A-DD-105 Evans DD The 2022 Eruption of the recurrent nova U Sco Flamingos2 5.50
Execution Status: complete Dates Taken:
20220612 20220616 20220617 20220619 20220630 20220705
Completion Status:
100%