Fast Turnaround Queue Summary : Semester 2019B GS

The tables below summarise the programs that constitute the Fast Turnaround program queue on GS.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2019B-FT-101 Moskovitz US Imaging of near-Earth asteroid pair 2017 SN16 - 2018 RY7 GMOS-S 10.00
Execution Status: complete Dates Taken:
20190830 20190901 20190902
Completion Status:
100%
GS-2019B-FT-102 Fraser CA Follow-up of Candidate New Horizons Extended Mission Targets GMOS-S 4.80
Execution Status: complete Dates Taken:
20190926 20190927 20191005
Completion Status:
100%
GS-2019B-FT-103 Trouille US Towards Validating Planet Hunters TESS Planet Candidates with Zorro Visitor 1.20
Execution Status: complete Dates Taken:
20190912 20191009
Completion Status:
100%
GS-2019B-FT-104 Richer CA A key white dwarf in the Initial Final Mass Relation GMOS-S 1.00
Execution Status: complete Dates Taken:
20191001 20191027 20191029 20191107 20191120
Completion Status:
100%
GS-2019B-FT-105 Seccull US Spectroscopic Monitoring of 2I/Borisov, an Interstellar Comet GMOS-S 9.10
Execution Status: complete Dates Taken:
20191126 20191127 20191128 20191129 20191201 20191203 20191206 20191208 20191217 20191219 20191223 20191224 20200101 20200102
Completion Status:
100%
GS-2019B-FT-106 Rodruck US Stellar populations in tidal debris GMOS-S 4.30
Execution Status: complete Dates Taken:
20191104 20191106
Completion Status:
100%
GS-2019B-FT-107 Moss US Patchy Atmospheres of Magnetic White Dwarfs GMOS-S 5.60
Execution Status: complete Dates Taken:
20191221 20191222
Completion Status:
100%
GS-2019B-FT-108 Afonso US The most distant quasar in the Universe at z = 10 ? GMOS-S 3.75
Execution Status: complete Dates Taken:
20191219 20191223
Completion Status:
100%
GS-2019B-FT-109 Cheng US Follow up on a newly discovered very low mass FU Ori object candidate Flamingos2 0.44
Execution Status: complete Dates Taken:
20191206
Completion Status:
100%
GS-2019B-FT-110 Vieira US SPT0202-61: The first SMG-SMG strongly-lensed system Flamingos2 6.00
Execution Status: complete Dates Taken:
20200103 20200113 20200115 20200121 20200219
Completion Status:
100%
GS-2019B-FT-111 Swihart US Spectroscopic Monitoring of the Compact Binary 4FGL J0407.7-5702 GMOS-S 2.60
Execution Status: complete Dates Taken:
20191230 20191231
Completion Status:
100%
GS Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2019B-FT-201 Leggett US The first K-band spectrum of a 400K Brown Dwarf Flamingos2 5.80
Execution Status: Dates Taken:
20190802 20190807 20190831 20190903 20190904
Completion Status:
2%
GS-2019B-FT-202 Afonso US Quasar pairs at redshift 6 GMOS-S 3.00
Execution Status: complete Dates Taken:
20190903 20190904 20190913 20190914 20190918 20190919 20190922 20191029
Completion Status:
100%
GS-2019B-FT-203 Kerr CA Red and Infrared Spectroscopy of a Peculiar White Dwarf System Flamingos2 / GMOS-S 2.40
Execution Status: Dates Taken:
20191027 20191028 20191029 20191124
Completion Status:
40%
GS-2019B-FT-204 Taak KR Longslit spectroscopy of J0002+0239, a candidate QSO lens - Pilot study of the High-z Universe probed via Lensing by QSOs (HULQ) project GMOS-S 4.00
Execution Status: Dates Taken:
20190914 20191129 20191130 20191203
Completion Status:
27%
GS-2019B-FT-205 Webb CA Studying the Fuel Supply in High-Redshift Brightest Cluster Galaxies Flamingos2 / GMOS-S 8.20
Execution Status: complete Dates Taken:
20191120 20191121 20191123 20191124 20191127 20191128 20191129 20191130 20191202 20191208 20191209 20191217 20200104
Completion Status:
100%
GS-2019B-FT-206 Court US A Possible Nova Shell around the Accreting White Dwarf AH Pic GMOS-S 0.80
Execution Status: complete Dates Taken:
20191109 20191112
Completion Status:
100%
GS-2019B-FT-207 Lee US NIR imaging and spectroscopy of 2I/Borisov Flamingos2 1.70
Execution Status: complete Dates Taken:
20191130 20191207
Completion Status:
100%
GS-2019B-FT-208 Lin US A magnetar-powered X-ray transient candidate from a binary neutron-star merger Flamingos2 2.20
Execution Status: complete Dates Taken:
20191130 20191207 20191223 20191231 20200101
Completion Status:
100%
GS-2019B-FT-209 Fruchter US A gamma-ray burst in an ancient galaxy. GMOS-S 3.00
Execution Status: complete Dates Taken:
20191221 20191222 20191230 20200101
Completion Status:
100%
GS-2019B-FT-210 Wang US Astrometric Monitoring of 51 Eridani b with the Gemini Planet Imager GPI 1.90
Execution Status: Dates Taken:
Completion Status:
0%
GS-2019B-FT-211 Madrid US Is 3C 297 a high-z fossil group? GMOS-S 2.00
Execution Status: Dates Taken:
20200218
Completion Status:
22%

 