[Mayan calendar]

Director's Discretionary Time Summary : Semester 2017A GN

The data shown in the tables below summarise the programs that constitute the "Director's Discretionary Time" (DDT) on GN. DDT proposals are typically for time-critical observations which cannot wait for the normal proposal cycle (e.g. unexpected astronomical events) or for testing the feasibility of a technique or of a program. See the DDT web page for more information. DDT proposals may be submitted at any time by any astronomer world-wide.

In other respects - contact scientist support, Phase II definitions, Gemini Science Archive data distribution - DDT programs are similar to other Gemini queue programs.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2017A-DD-1 Burgarella Estimating the redshift of a dusty, lensed, massive galaxy in the North Ecliptic Pole GMOS 5.70
Execution Status: complete Dates Taken:
20170521 20170526 20170527
Completion Status:
100%
GN-2017A-DD-2 Lee A Milky-Way-Sized Galaxy in a Proto-cluster at Z=3.78? GMOS 3.50
Execution Status: complete Dates Taken:
20170404 20170408
Completion Status:
100%
GN-2017A-DD-3 Atcherson Maunakea Scholars: Rogue planets GNIRS 1.00
Execution Status: complete Dates Taken:
20170329
Completion Status:
100%
GN-2017A-DD-4 Banados The black hole mass of a bright QSO at a new redshift record GNIRS 5.00
Execution Status: complete Dates Taken:
20170331 20170403
Completion Status:
100%
GN-2017A-DD-5 Lopez Maunakea Scholars II: Planet weather GNIRS / GNIRS+Altair 1.00
Execution Status: complete Dates Taken:
20170509 20170510 20170511
Completion Status:
100%
GN-2017A-DD-6 Harris Long Slit Spectroscopy of ULIRG with Type II Quasars GMOS 2.00
Execution Status: complete Dates Taken:
20170520
Completion Status:
100%
GN-2017A-DD-7 Heinke Correlations in the Rapid Optical & X-ray Variability of the X-ray Binary NGC 6652B AcqCam / Visitor 1.00
Execution Status: complete Dates Taken:
20170519 20170522
Completion Status:
100%
GN-2017A-DD-8 Geballe Monitoring Carbon Monoxide and Dust Emission in SN2017eaw GNIRS 3.00 [r18A]
Execution Status: complete / rollover Dates Taken:
20170605 20170616 20170626 20170706 20170707 20170830 20170831 20170915 20171001
Completion Status:
100%
GN-2017A-DD-9 Smith Strong-lensing Galaxy Clusters GMOS / GMOS-S 7.00
Execution Status: RToO Dates Taken:
Completion Status:
0%
GN-2017A-DD-10 Sheppard A New Unusual Satellite of Jupiter GMOS 1.00
Execution Status: complete Dates Taken:
20170613
Completion Status:
100%

 

[Science Operations home] [schedules home]