Director's Discretionary Time Summary : Semester 2007B GN

The data shown in the tables below summarise the programs that constitute the "Director's Discretionary Time" (DDT) on GN. DDT proposals are typically for time-critical observations which cannot wait for the normal proposal cycle (e.g. unexpected astronomical events) or for testing the feasibility of a technique or of a program. See the DDT web page for more information. DDT proposals may be submitted at any time by any astronomer world-wide.

In other respects - contact scientist support, Phase II definitions, Gemini Science Archive data distribution - DDT programs are similar to other Gemini queue programs.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2007B-DD-2 Michaud The Gemini Legacy Survey NIRI+AltairLGS 2.50
Execution Status: Dates Taken:
20070925
Completion Status:
0%
GN-2007B-DD-3 Kotak Near-infrared observations of a unique nearby supernova NIRI 6.00
Execution Status: complete / SToO Dates Taken:
20070918 20071010 20071102 20071103 20071120 20071220 20080109 20080215 20080216 20080220
Completion Status:
100%
GN-2007B-DD-4 Beck Dynamical Masses of Pre-Main Sequence Stars: Disentangling the Masses of the Enigmatic T Tau Triple. NIRI+Altair 0.00
Execution Status: complete Dates Taken:
20070912
Completion Status:
100%
GN-2007B-DD-5 Bassa Constraining the Origin of an Eccentric Millisecond Pulsar Binary in the Galactic Disk GMOS 0.75
Execution Status: complete Dates Taken:
20070920
Completion Status:
100%
GN-2007B-DD-6 Leggett Discovering Cool and Old White Dwarfs in the UKIDSS and SDSS Surveys GMOS 10.00
Execution Status: complete Dates Taken:
20080103 20080109 20080110 20080304 20080313
Completion Status:
100%
GN-2007B-DD-7 Bean Direct Imaging Search for Stellar and Substellar Companions to the Exoplanet Host Star XO-3 NIRI+Altair 1.67
Execution Status: complete Dates Taken:
20080106 20080107
Completion Status:
100%
GN-2007B-DD-9 Berger An Extreme X-ray Transient in NGC 2770 - A Possible Low-Energy X-Ray Flash in the Local Universe GMOS 13.65
Execution Status: complete / RToO Dates Taken:
20080119 20080122 20080125 20080130 20080211
Completion Status:
100%
GN Director's Discretionary Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2007B-DD-1 Rest Spectral Classification of the Cas A and Tycho Supernovae with Light Echo Spectra GMOS 4.00
Execution Status: complete Dates Taken:
20070910 20070913 20070914 20070918 20070919 20070921 20070927 20071125
Completion Status:
100%
GN-2007B-DD-8 Mattila Near-IR imaging of SN 2006jc NIRI 1.50
Execution Status: complete Dates Taken:
20080127 20080128 20080129
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:29:30 GMT